Laserfiche WebLink
<br />ATTACHMENT <br /> <br />Bid/Contract Documents <br />. (Plans, timelines, cost breakdowns and specifications included in bid packages to become part of the <br />Agreement) <br /> <br />and completion of the Work. Contractor will not substitute any materials, equipment or fixtures for <br />those referenced in the Specifications, without the prior written consent of Owner. <br />3.3 Contractor shall at all times enforce strict discipline and good order among his employees <br />and Subcontractors. Contractor and all Contractor employees or Subcontractors performing the Work, <br />are, and will at all times during the Project be, fully certified, where available, by all manufacturers of <br />equipment being installed by Contractor as part of the Project (including with respect to any updates or <br />bulletins available from such manufacturers). <br />3.4 Contractor shall (i) pay all sales, consumer, use and other similar taxes required by law <br />and (ii) secure all Permits, fees and licenses necessary for the execution of the Work and provide copies <br />thereof to Owner prior to commencement of the Work. <br />3.5 The Work will be performed in accordance with best industry standards. Contractor shall <br />give all notices to, and comply with all laws, ordinances, rules, regulations and orders of, any public <br />authority bearing on the performance of the Work, and shall promptly notify Owner if the Drawings or <br />Specifications are at variance therewith. <br />3.6 Contractor shall be responsible for the acts and omissions of its employees and all <br />Subcontractors, their agents and employees, and all other persons performing any of the Work under <br />contract with Contractor. <br />3.7 Contractor shall review, stamp with his approval and submit all samples and shop <br />drawings, as directed for the approval of Owner, for conformance with the design concept and the <br />information given in the Contract Documents. The Work shall strictly conform to the approved samples <br />and shop drawings. <br />3.8 Contractor shall at all times keep the Project free from accumulation of waste materials or <br />rubbish caused by its performance of the Work. Upon completion of the Project, it shall remove all of <br />its waste materials and rubbish from and about the Project as well as all tools, construction equipment, <br />machinery and surplus materials and shall clean all glass surfaces and leave the Project "broom clean" or <br />its equivalent. <br />3.9 Contractor shall indemnify, defend and hold Owner and its agents and employees <br />harmless from and against all claims, damages, liabilities, losses and expenses including attorneys' fees <br />and costs, arising out of or resulting from (i) Contractor's (or any Subcontractor's) failure to comply <br />with the obligations of Contractor as contained in the Agreement or the Contract Documents (including <br />breach of any warranty), (ii) the performance of the Work by Contractor and its Subcontractors, or (iii) <br />the negligence or intentional conduct or omissions of Contractor. or Subcontractors. The indemnity <br />obligations contained herein shall include any claim, damage, losses or expenses attributable to bodily <br />injury, sickness, disease or death, or to injury to or destruction of tangible property, including the loss of <br />use resulting therefrom, and which is caused in whole or in part by any act or omission of Contractor, <br />any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any <br />of them may be liable, REGARDLESS OF WHETHER OR NOT CAUSED IN PART BY THE <br />NEGLIGENCE OF A PARTY INDEMNIFIED HEREUNDER. In any and all claims against Owner or <br />any of its agents or employees by an employee of Contractor, any Subcontractor, anyone directly or <br /> <br />128770 <br />Form <br />4400158 <br />5/04 <br /> <br />GC <br /> <br />