<br />Page 6 of 6
<br />
<br />TFP1810
<br />
<br />Figure 321
<br />
<br />~ C to E---!
<br />I
<br />
<br />-----1-----
<br />
<br />-1
<br />
<br />c to E
<br />I
<br />
<br /> Figure 321 Reducing Tee
<br />Nominal CtoE Appx, Wt. Nominal CtoE Appx, WI.
<br />Size Inches Lbs, Size Inches Lbs,
<br />Inches mm Ka, Inches mm Kg,
<br />1'12 X 1'hx 1'.4 3.25 2,0 6x6x4 6,50 26,6
<br />82,6 0,9 165,1 12,1
<br />2x2x1'h 3,25 2,7 6x6x5 6,50 27,0
<br />82.6 1,2 165,1 12,2
<br />2'/2 x 2'h x 1'.4 3,75 4,2 8x8x2 7.75 36,2
<br />95,3 1.9 196,9 16.4
<br />2'h x 2'h x 1'12 3.75 4,2 8x8x3 7.75 36,5
<br />95,3 1,9 196.9 16,6
<br />2'h x 2'h x 2 3.75 4,3 8x8x4 7.75 36,6
<br />95,3 2.0 196,9 16.6
<br />3x3x1'h 4,25 5.3 8x8x5 7.75 36,8
<br />108,0 2.4 196,9 16.7
<br />3x3x2 4,25 5,5 8x8x6 7,75 37,0
<br />108.0 2,5 196.9 16,8
<br />3 x 3 X 2'12 4,25 5,8 10x10x2 9,00 57,1
<br />108,0 2.6 228.6 25,9
<br />4x4x 1';' 5,00 9,8 10x10x3 9,00 57.4
<br />127.0 4.4 228.6 26,0
<br />4x4x1'h 5.00 9,9 10x10x4 9.00 57,6
<br />127.0 4,5 228.6 26,1
<br />4x4x2 5,00 10.1 10x10x5 9.00 57,8
<br />127,0 4.6 228,6 26,2
<br />4x4x2'h 5.00 10.3 10x10x6 9.00 58,0
<br />127,0 4.7 228.6 26,3
<br />4x4x3 5,00 10,5 10x10x8 9.00 58.4
<br />127.0 4,8 228.6 26.5
<br />5x5x2 5,50 14.5 12x12x3 10.00 80.2
<br />139.7 6,6 254,0 36.4
<br />5x5x2'h 5,50 14,8 12x12x4 10.00 80.5
<br />139.7 6.7 254,0 36.5
<br />5x5x3 5.50 15,2 12x12x5 10,00 80,7
<br />139.7 6.9 254.0 36.6
<br />5x5x4 5.50 15.8 12x12x6 10,00 80.9
<br />139.7 7.2 254.0 36.7
<br />6x6x2 6,50 26,5 12x12x8 10,00 91.4
<br />165.1 11,9 254.0 41.5
<br />6x6x2'h 6,50 26,5 12x12x10 10.00 91.8
<br />165,1 12,0 254,0 41,6
<br />6x6x3 6.50 26.5
<br />165.1 12,0
<br />
<br />Figure 321
<br />
<br />General Notes: It is the Designer's responsibility to select products suitable for the intended service and to ensure
<br />that pressure ratings and performance data is not exceeded. Always read and understand the installation instructions
<br />(IH-1000), Never remove any piping component or correct or modify any piping deficiencies without first
<br />depressurizing and draining the system, Material and gasket selection should be verified to be compatible for the
<br />specific application,
<br />
<br />TYCO FIRE PRODUCTS, 451 North Cannon Avenue, Lansdale, Pennsylvania 19946
<br />
<br />
<br />Certified Company
<br />Printed U,S.A,
<br />
<br />
|