Laserfiche WebLink
<br />8949 Gall Boulevard, Zephyrhills, FI33541 <br />PH: (8 J 3) 782-0920 & (352) 567-8580 Fax: (8 J 3) 715-4875 <br />STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR #CB-C0598 17 and #CC-C058 134 <br />SERVING FLORIDA'S FINEST HOMES & BUSINESSES SINCE 1976 WWW.schaperconstruction.com <br /> <br />SCJ{.!l([XE(j{ Roofing, 'nc. <br /> <br />Name St. Elizabeth's Episcopal Church <br />Address 5855 16th St. <br /> <br />Shingle and Bur Combination <br /> <br />Date <br /> <br />11/1/2007 <br /> <br />Attn: Wes "Sonny" Manning <br /> <br />Phone <br /> <br />813-788-6885 <br /> <br />City Zephyrhills <br /> <br />Alt Phone <br /> <br />State FL <br /> <br />Parcel # <br /> <br />Zip <br /> <br />33542 <br /> <br />We hereby propose to furnish materials and labor necessary for the completion of: <br /> <br />Shingle Re-roof <br />1. For the shingled portions of the home, remove old roofing materials to dry-in, taking precautions to <br />protect the building and the landscaping. Groom the deck and reset existing decking nails. <br />2. Replace bad wood other than herein agreed for at $44.00 per man-hour plus materials marked up a <br />25% contractor's fee. <br />3. InstaII white eaves drip with all edges sealed with plastic cement. <br />4. InstaIl one layer(s) of ASTM 15 lb. Asphalt shingle underIayment. <br />5. InstaIl galvanized vaIley metal for the length of all valleys. VaIleys wiII be closed. <br />6. InstaIl new lead boots over vent pipes and replace metal vents with new. <br />7. Chalk lines shall be struck to assure proper shingle exposure. Install ~ year J..tab Class A self- <br />sealing fungus resistant fiberglass shingles. Six I v." corrosion resistant nails shall be installed per <br />manufacturers instructions. <br />8. Shingle Manufactures: GAF Color Silver Linnin~ <br />9. Hurricane nail the deck to the railers option to meet CUrrent SBCCI code. See price section. <br />10. InstaIl -BL feet of aluminum ridge vent. See pricing section. <br /> <br />Bur Replacement <br />11. For the flat roof portions of the home, remove old roofing materials to dry-in, taking precautions to <br />protect the building and the landscaping. Groom the deck and reset existing decking nails. <br />12. Replace bad wood other than herein agreed to at $44.00 per man-hour plus materials marked up at <br />25% contractor's fee. <br />13. InstaII fiberglass base sheet utilizing proper fasteners and fastening pattern <br />of modified bitumen as foundation for edge metal. <br />14. InstaII white permanent finish edge metal. <br />15. InstaII modified bitumen roof system. <br />16. If applicable, instaII new lead boots over vent pipes and reseal. <br />17. If applicable, instaIl new all purpose roof vents and reseal. <br /> <br />Shingle and BUR Modifications <br /> <br /> <br />Only doin the shingle sections that tie into the flat roof bye the alley <br />