Laserfiche WebLink
<br />SCIf.J/.CPF/l{ Roofing, Inc. <br /> <br />SHINGLE & BUR COMBINA nON continued. . . <br /> <br />SchaDer Roofin2. Commitment to Quality <br />· All work shall he carefully supervised and completed hy workmen skilled and knowledgeahle in methods <br />needed to produce high quality work. <br />· The job site shall be kept clean daily for the duration of the job and the grounds shall be left clean of all roof <br />related debris after completion. <br />-The yard shall be swept with a magnet. <br />-The contractor shall provide permit, workman compensation, and general liability insurance. <br />'Carpentry, authorized change orders and work, which are not covered under the scope of work outlined herein, <br />shall be performed on a time and material basis unless otherwise agreed upon. <br /> <br />MANUFACTURER & CONTRACTOR WARRANTY (S) <br />Upon completion of the work and payment of all monies owed, Contractor shall issue: <br />I. A -L year warranty for workmanship limited to leaks caused by any component install by the contractor. <br />2. Shingle manufacturer shall provide a ~ year limited warranty. <br />3. Bur Warranty 12 year limited warranty <br /> <br />Visible T & M allowance--_______________________________________________________________ <br />Shingle Re-roof as described herein----__________________________________________________ <br /> <br />Ridge vent option-----______________________________________________________________________ <br /> <br />Other <br /> <br />**********CONTRACT PRICING********** <br /> <br />3,460.00 <br /> <br />Agreed upon CONTRACT PRICE, Jabor and material----_________ $ <br /> <br />TERMS 30% down, 30% at start of work, Balance upon completion. <br />= <br /> <br />3,460.00 <br /> <br /> <br />price valid for thirty (30) days. <br /> <br />her with interest shall be added to the contract price if payment default occurs. Cancellation <br />our ce period shall incur a no~~~ fee. <br /> <br />Date 11/1/2007 <br /> <br />