Laserfiche WebLink
<br />. ",\-\ ~~0:ECT!OV~..,'."...."" '...... <br />,~~~ . - .-:.-: -, :....~ - . - <br />!$ii' . .;L~;,;-, . <br />~~ -'. ~_ J:'~'~'" >'l~ <br />~~. 'v.~ '\ <br />!FLq~~~.7 .\' <br /> <br /> <br />~~:".:>) <br /> <br />Department of <br />Environmental Protection <br /> <br />Jeb Bush <br />Governor <br /> <br />Southwest District <br />3804 Coconut Palm Drive <br />Tampa, Florida 33619 <br /> <br />Colleen M. Castille <br />Secretary <br /> <br />PERMlTTEE: <br />Casey Lane Townhomes, LLC <br />David A. Waronker, President <br />901 Begonia Road <br />Celebration, FL 34747 <br /> <br />Pennit No. CS51-0030492-055 <br />Issuance Date: 8/11/05 <br />Expiration Date: 8/10/10 <br />Processor: Rudy L. Isaac <br /> <br />PROJECT: <br />Chasey Lane Townhomes <br />Zephyrhills <br />Pasco County <br /> <br />/ <br /> <br />This pennit is issued under the provisions of Chapter 403, Florida Statutes, and Florida Administrative <br />Code Rulc(s) 62-3, 62-4, and 62-604. The above-named permittee is hereby authorized to perform the <br />work or operate the facility shown on the application and approved drawing(s), plans, and other <br />documents enclosed herewith or on file with the Department and made a part hereof and specifically <br />described as follows: <br /> <br />DESCRIPTION OF PROJECT: <br />Construction of a domestic wastewater collection/transmission system to serve 256 single-family homes. <br />Estimated flows of 57,600 gpd will be treated at the City of Zephyrhills Wastewater Treatment Plant <br />(WWTP) [Facility ill # FLAOl2744]. <br /> <br />SPECIFIC CONDITIONS: <br />1. Drawings, specifications, information, and correspondence submitted in support of the permit <br />application for this system are incorporated into this permit and must be adhered to during <br />installq.tion and operation of the system. <br /> <br />2. This pennit does not authorize the connection of this collection system to the designated WWTP. <br />The permit shall not be construed to infer any assurance that the necessary authorization for <br />connection shall be granted. Any such authorization shall be granted only when adequate treatment <br />in accordance with rules, regulations, and issued permits of the Department is available for any flows <br />transported by the system. <br /> <br />3. No portion of this system may be installed in FDEP jurisdictional wetlands prior to the receipt of any <br />and all required wetlands resource management permits. <br /> <br />4. The waterlsewerlreclaimed water clearance requirements specified in Rule 62-555.314, Florida <br />Administrative Code, shall be adhered to throughout the project, and shall supersede any <br />specifications included in the documentation submitted in support of the permit application for this <br />system. <br /> <br />5. No portion of this system shall be installed within 100 feet of a public supply potable water well. <br /> <br />"More Protection, Less Process" <br /> <br />Printed on recycled poper, <br />