Laserfiche WebLink
<br />2 <br /> <br />13. Contractor responsible for color coding fire hydrants after they have been <br />flow tested by Fire Rescue. <br /> <br />Inspections required for total project: <br /> <br />1. Fire line underground pressure test. <br />2. Hydrant flow test on all new and relocated hydrants. <br />3. Sprinkler pressure test. <br />4. Sprinkler acceptance test. <br />5. Fire alarm acceptance test. Test includes checking CO detectors and fan shut <br />downs. <br />6. Propane gas line pressure and fmal test. <br />7. All firewalls/fire partitions shall have screw inspects and finals. <br />8. Generator test. (witnessed by FM) <br />9. Fire pump test. (witnessed by FM) <br />10. Building final. <br />