My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9529
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2011 9:48:27 AM
Creation date
1/7/2011 1:17:09 PM
Metadata
Fields
Template:
Building Department
Company Name
RAMAPPA, DR. G.M.
Building Department - Doc Type
Permit
Permit #
09-9529
Building Department - Name
RAMAPPA, DR. G.M.
Address
7323 GREENSLOPE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOUTHEAST DESIGN <br /> INTERNATIONAL INC. <br /> 2151 SOUTHERN OAKS LANE, LAKELAND FL -33813 <br /> TEL: 863 -409 -6422. FAX: 863 - 648 -9069 <br /> INTERIOR BUI LDOUT CONTRACT <br /> DR RAMAPPA ZEPHYRHILLS FLORIDA. <br /> PATE: 27 AVGVSf 2009 <br /> 1. The undersigned owner authorizes the undersigned builder to construct and <br /> deliver to said owner a build out as per owners plan. <br /> The project location has been identified as a parcel ID and proper address is identified <br /> as ofthe project is <br /> Located in Tel: <br /> 2. Except as proved in the paragraph dealing with allowances hereafter, the total cost <br /> to the • shall be 2i-I determined after completions of <br /> drawin• . V(`I Cr [� Q�t , �Y�-ti C ( S �C) <br /> OWNERS RESPONSIBILITIES/ Yr � Z & Q 3t3tt <br /> L ane ��e���i�..- i��J�it� :TZ�s te -. - <br /> 4r ..r�r, ..' "- Ii b ar- ssr rle s etc <br /> Construction cost on interior and the agreed amount shall be paid as follows: <br /> 5000$ deposit ofthe total fees ofthe builder based on cost of <br /> project will be paid to the builder upon dosing of construction <br /> loan and before start of construction. <br /> 7000$ at the start of contrscution. <br /> 9000$ at the time of ceiling grid installation <br /> 3000$ at the time of completion of job. <br /> f2 ems-P <br /> 3. The construction of the project shall be completed within approximately 45days <br /> from the time the permit is issued.. Severe weather conditions, unexpected changes in <br />
The URL can be used to link to this page
Your browser does not support the video tag.