My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9529
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2011 9:48:27 AM
Creation date
1/7/2011 1:17:09 PM
Metadata
Fields
Template:
Building Department
Company Name
RAMAPPA, DR. G.M.
Building Department - Doc Type
Permit
Permit #
09-9529
Building Department - Name
RAMAPPA, DR. G.M.
Address
7323 GREENSLOPE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
design by owner or city, failure of financial obligations from bank or owner or for <br /> unexpected unforeseen conditions not in control of the builder may delay the <br /> project indefinitely and such time may have to be added to the period. <br /> 4. The cost of any alterations, additions, omissions or deviations at the request of the <br /> owner shall be added to the agreed purchase price. All changes will have to be <br /> authorized via the main builder and an effort should be made to have them <br /> authorized in writing for better clarifications. Owner is requested to discuss changes <br /> with the subcontractors only after proper consultations with builder. In the event that <br /> such changes are made without the knowledge of builder and without proper <br /> paperwork, the owner 15 entitled to pay all the costs related to such changes. All <br /> checks paid by owners to material suppliers or any subcontractors will have to be <br /> processed by the builder before issuance for proper exchange of lien waivers. In view <br /> of the above situation it is recommended that the owners do not write any checks <br /> without proper consultations with the builder. <br /> Every effort will be exerted on the part of the builder to complete the construction <br /> within the period described above. However, builder assumes no responsibilities for <br /> delays occasioned by causes beyond his control. In the event of a delay of <br /> construction caused by weather, purchaser's selections, or due to change in code or <br /> inspectors interpretation etc., the period of delay will be added to the construction <br /> period allotted to builder. The owner agrees to provide Builders risk policy during the <br /> construction of the home. <br /> 5. This contract pages 1/2 shall inure to the benefit of, and shall be binding <br /> upon, the parties hereto, their heirs, successors, administrators, executors and assign. <br /> 6. This contract constitutes the sole and entire agreement to between the parties <br /> hereto and no modification of this contract shall be binding unless attached hereto <br /> and signed by all parties to the agreement. No representation, promise, or <br /> inducement to this agreement not included in this contract shall be binding upon any <br /> party hereto. <br /> The parties do set their hands and seals the day and year first above written. <br /> Sign: ate: <br /> Owner's name: 9 \\ \oe <br /> Address: <br /> Tel: <br /> Sign: ��1 Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.