Laserfiche WebLink
Zephyrhills Fire Rescue <br /> 6907 Dairy Road, Zephyrhills, FL 33542 <br /> Fire Marshal Bus (813) 780 -0041 <br /> Kerry Barnett Fax (813) 780 -0044 <br /> E mail: kbarnett'a;tire.zephyrhills.tl.us <br /> Plan Review #: 08 -163 <br /> Project: Tire Kingdom <br /> Number of Pages: 64 <br /> Date: December 15, 2008 <br /> I have received and reviewed plans for Tire Kingdom. Tire kingdom is classified as <br /> Special Purpose Industrial as defined by NFPA 101. It shall be considered a minor repair <br /> garage and shall also comply with the applicable sections of NFPA 30A. will allow this <br /> project to move forward. Payment for permit contractor acknowledges agreeing with <br /> items below. <br /> Should anyone have any questions, please do not hesitate to contact the Fire Marshal's <br /> office. <br /> 1. Fire safety practices shall be followed during construction in accordance to <br /> NFPA 1. <br /> 2. 20' wide roadway shall be provided around the construction site during <br /> construction to support the weight of a fire apparatus. This roadway shall be <br /> maintained. <br /> 3. Separate plans required by sprinkler contractor to obtain permit. Plans shall <br /> consist of all details, specs, calcs of sprinkler system. Details of in -rack piping (as <br /> stated on plans) shall also be supplied. If storage or displays are going to be <br /> placed under canopy — sprinklers shall be located under canopy. <br /> 4. Separate plans shall be submitted by fire alarm contractor to obtain permit. Plans <br /> shall consist of all details, specs and battery calcs of alarm system. Be advised <br /> that additional alarm notification devices will be required in addition to what is <br /> required by the monitoring of the sprinkler system. Alarm contractor may contact <br /> Fire Marshal prior to submitting plans. <br /> 5. Permit (by Fire Department) required for any roofing operation that is a tar kettle <br /> or torch operation job and shall be compliant to NFPA 1. <br /> 6. Page C -9: Detail of FDC should be 5" Storz (30 — 45 degree) Plans do show 5" <br /> Storz <br /> 7. Knox box shall be located outside main door at a height of 6'. <br /> 8. Certified fire extinguishers shall be provided throughout in accordance to NFPA <br /> 10. <br /> 9. Panic hardware shall be installed on all secondary exits. <br />