My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9861
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9861
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2011 3:14:50 PM
Creation date
1/19/2011 3:14:46 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
09-9861
Building Department - Name
ZEPHYR COMMONS LLC
Address
7780 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILTER FABRIC: <br /> FILTER FABRIC SHALL BE 4 OZ. NON -WOVEN GEOTEXTILE. PROVIDE 12 INCH LAP @ <br /> VERTICAL JOINTS AND 2 INCHES TURNING @ EACH LAYER OF GEOGRID. EXTEND <br /> FILTER FABRIC 18" BEYOND JOINT WITH EXISTING STRUCTURES AND WRAP IT <br /> WITH EXISTING STRUCTURE. <br /> BACKFILL MATERIAL: <br /> BACKFILL MATERIAL SHALL BE CLEAN FREE DRAINING SAND (SUCH AS GP, GW, <br /> SW, SP, SM BASED ON UNIFIED SOIL CLASSIFICATION SYSTEM) WITH 10% OR LESS <br /> FINES. SAND FRICTION ANGLE FOR THIS MATERIAL SHALL BE 30 DEGREES <br /> MINIMUM. <br /> ANCHOR WALL UNIT INSTALLATION: <br /> INSURE THAT UNITS ARE IN FULL CONTACT WITH BASE. PLACE SHIMS AS <br /> REQUIRED MAINTAINING DESIGN BATTER. <br /> FILL ALL VOIDS AT UNITS WITH DRAINAGE FILL MATERIAL. TEMP DRAINAGE FILL. <br /> SWEEP ALL EXCESS MATERIAL FROM TOP OF UNITS AND INSTALL NEXT COURSE. <br /> INSURE THAT EACH COURSE IS COMPLETELY FILLED WITH CRUSHED STONE. <br /> PULL THE UNITS FORWARD UNTIL THE LOCATING SURFACE OF THE UNIT <br /> CONTACTS THE LOCATING SURFACE OF THE UNITS IN THE PRECEDING COURSE. <br /> PULL THE UNIT FORWARD AS FAR AS POSSIBLE. <br /> GEOGRID INSTALLATION: <br /> THE GEOGRID SOIL REINFORCEMENT SHALL BE LAID HORIZONTALLY ON TOP OF <br /> THE ANCHOR WALL UNIT AND HORIZONTALLY ON COMPACTED BACK FILL. <br /> PULL GEOGRID TAUT AND ANCHOR WITH SOD CLIPS (OR EQUAL). THEN PLACE <br /> BACKFILL ON TOP OF THE GEOGRID. <br /> CORRECT ORIENTATION (ROLL DIRECTION) OF THE GEOGRID SHALL BE VERIFIED <br /> BY THE CONTRACTOR. <br /> FILL PLACEMENT: <br /> BACKFILL MATERIAL SHALL BE PLACED IN 12 INCH LIFTS AND COMPACTED TO <br /> 95% OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D - 1557). <br /> VIBRATORY PLATE COMPACTOR SUCH AS "BPU 3345 A" BY WACKER <br /> CORPORATION CAN BE USED. <br /> TESTING METHODS AND FREQUENCY, VERIFICATIONS OF MATERIAL <br /> SPECIFICATIONS AND COMPACTION SHALL BE THE RESPONSIBILITY OF THE <br /> OWNER. AS A MINIMUM, EACH AND EVERY 12" LIFT MUST BE TESTED. TEST <br /> LOCATION SHOULD NOT EXCEED 100 L.F. (ALONG THE LENGTH), OF THE WALL. <br /> FILTER FABRIC SHALL BE PLACED BETWEEN CRUSHED STONE AND SAND. <br />
The URL can be used to link to this page
Your browser does not support the video tag.