Laserfiche WebLink
1;i \141/11P‘LI <br /> CO DPBU11.3) <br /> Lw ES ORI °n <br /> VAIL �Ip A L ELE� g s0 OCES <br /> CIT`I 0� Z <br /> ogNa <br /> SCOPE. OF WORK (:)g Prk <br /> East Building, North Section (North of Expansion Joint) <br /> East Building, South Section (South of Expansion Joint) <br /> kneiP 11.5) <br /> 1. emovepll loose gravel, base flashings, wall flashings, coping caps, <br /> pitch pans, vents, drain fleshings, soil stack flashings, eave drip and gutters. <br /> 2. Provide pull tests by independent party to determine proper fastener to <br /> use and fastening pattern. <br /> 3. Install fast layer of Soprema's Soprafix SBS modified bitumen <br /> membrane mechanically attached with Trifixx or screws at laps and seal <br /> laps by heat weld method. <br /> 4. Install new lead soil stack flashings, drain lead, vents, scuppers, eave <br /> drip, coping caps with cleat for "high wind" design, pitch pans and skirt <br /> metal under rim of HVAC units at top of curbs. <br /> 5. Install .032 mils. painted aluminum fleshings with standard colors <br /> chosen by owner. <br /> 6. Install new expansion joints and metal covers to protect them. <br /> 7. Install new spun aluminum breather vents, one per every 1000 sq. ft. of <br /> roofing area. <br /> 8. Install new aluminum retrofit drains to go over existing "aged" drains <br /> and flash into new roof system. Provide new drain strainer basket and <br /> "lock" into place. <br /> 9. Provide two layers of Soprema membrane at all curbs and wall base <br /> flashing areas. <br /> 10. Install Soprema's SBS modified bitumen cap sheet "Sopralene Flam <br /> Gran 180) FRGR membrane by heat weld torch application. <br /> Z 'd 69H ' °N OINI1D 1 VOIN013 11d117 6007 1 •UnP <br />