Laserfiche WebLink
11. Reinstall gutters after eave drip is installed. Seal all laps in gutters and <br /> end caps. <br /> 12. Clean up and haul away all debris and finish all punch list items. <br /> Provide Soprema's fatal inspection report to owner. <br /> 13. Provide Soprema's 20 -year no dollar limit (NDL) warranty for all <br /> workmanship, materials and labor at no cost to owner per the Soprema roof <br /> warranty document. <br /> 14. Install pressure treated wood blocking under all A/C condensation lines <br /> and hose water pipe. Wrap blackings with Soprema membrane. <br /> 15. Install Soprema membrane with blue granules around roof hatch and <br /> all HVAC units and provide 20 -year warranty on them from Soprema. <br /> Total for both at same time Sum -= $379,120.00 <br /> North Section Sum = $190,507.00 <br /> South Section Sum = $188,613.00 <br /> '1 68tI ' °N DIN110 1V3103W VaIaO13 Wdlti E 600/ 1 'unf <br />