My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-9360
Zephyrhills
>
Building Department
>
Permits
>
2009
>
09-9360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2011 9:22:33 AM
Creation date
1/24/2011 9:22:26 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
09-9360
Building Department - Name
LUCKEY,SHERMAN & ALISE
Address
39119 PARK DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. After the first panel has been secured, the next panel can be installed. Attention <br /> needs to be given to correctly endlap the GrandBeam panel. The hem of the panel <br /> being installed needs to be placed over the edge of the previously installed panel's <br /> anti - siphon channel (Detail A). The panel lap will be secured using a #12 -14 x <br /> 3 /" stitch screw with sealing washer at each rafter location (Page 10 — <br /> Fastener Location). After determining that the panel being installed is square, a <br /> single #12- 14x1" HWH SDST screw should be placed in each panel flat, directly <br /> before the rise in the panel rib (Detail A). Be sure that all fasteners are going into <br /> the rafters. Fasteners should be placed at every rafter /support location. Repeat this <br /> step for all remaining panels with the exception of the final panel installation. <br /> 5. The installation of the final panel (the panel closest to the ridge), can be <br /> accomplished using two different methods based on the building width and roof pitch. <br /> Method 1: Install the final panel following the same procedure as that of the <br /> previously installed panels. If the top of the panel extends beyond the ridge area, <br /> trim excess before securing the panel. <br /> Method 2: In some cases trimming of the final panel can be avoided by shifting the <br /> final panel down, creating an overlap of one full rib (Detail D). Fasten the panel <br /> using the same steps as that of the standard panel overlap. <br /> 6. With all of the panels securely in place, the J or gable trim can be installed to finish <br /> off the edges of the GrandBeam panel's at the gable ends. This trim should fastened <br /> into each rib of the GrandBeam panel using #14 -14 x1" type A stitch screw with <br /> sealing washer (Detail B). <br /> 7. After all panels and trim have been installed, the ridge cap can be fastened in place. <br /> The ridge cap is installed using #14 -14 x 1" type A stitch screws, every 12" o/c on <br /> both sides of the ridge. The fasteners should pass through the ridge cap and into the <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.