Laserfiche WebLink
Metal Frame Carport Incorporating Eave Overhang or Soffit Box <br /> Limit 26 gauge GrandBeam panels to no greater than 27'6" for ease of handling. Limit <br /> 29 gauge embossed GrandBearli panels to 18'6" for ease of handling. <br /> NOTE: 29 gauge embossed GrandBeam is for siding purposes only, not roofing. <br /> 1. Install eave flashing using #12 -14 x 1" HWH SDST screw with sealing washer. Drive <br /> fastener through eave flashing into support, every 24" or at every support location. <br /> Only install fasteners into fascia leg of eave flashing. Do not place fasteners through <br /> upper leg of eave flashing due to possible interference with the panel. Upper leg of <br /> the flashing will be secured when panels are installed. <br /> 2. Install the gable flashing(rafter flashing), if required, using #12 -14 x 1" HWH SDST <br /> screw with sealing washer every 24" o/c (Detail B). Do not install fasteners on the <br /> top of the rafter due to possible panel / fastener interference. <br /> 3. With the eave and gable(rafter) flashing in place, the first GrandBeam panel can be <br /> installed. Panel placement should begin at the eave working up -slope toward the <br /> ridge. Place the first panel so that the panel hem overhangs the eave by <br /> approximately 1 "- 2 ". Once the panel has been determined to be square, place a <br /> #12- 14x1" HWH SDST screw with sealing washer through each flat of the panel and <br /> into the rafter. The correct location for the fastener is in the flat part of the panel, <br /> directly before the rise of the rib (Detail A). Continue this fastening technique across <br /> the entire length of the panel at every rafter. This first panel or course, will require an <br /> additional fastener at the eave location. This fastener will hold the panel flat and <br /> secure at the eave (Detail C). Gable ends receive two fasteners in the flat (see <br /> fastener location detail). If more than one panel is needed per course, complete <br /> the course using the standard GrandBeam sidelap detail. Install panels so sidelaps <br /> are staggered from those of the previous course. <br /> 5 <br />