My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10491
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2011 2:08:59 PM
Creation date
2/1/2011 2:08:50 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
10-10491
Building Department - Name
ZEPHYR COMMONS LLC
Address
7850 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II I <br /> board sheathing with enamel paint on the interior side. All framing, sheathing, and insulation shall <br /> terminate 10' -6" AFF. The restroom shall have VCT flooring and 6" high vinyl base on the inside of all <br /> walls. The owner shall be responsible for selecting paint, VCT, and vinyl base colors. <br /> 14. The restroom shall have a pre -hung, hollow core wood door with a reinforced panel to accept a closer and <br /> a solid wood frame. The door shall be 1 -3/4" x 36" x 80 ". The exterior of the door shall be left paint <br /> ready. The interior of the door shall receive enamel paint to match the restroom walls. The hardware set <br /> shall include 3 hinges, 3 silencers, 1 wall stop, 1 automatic closer, and 1 "Schlage Passage Latch" lockset. <br /> The door shall also receive ADA accessible signage as required by code. <br /> 15. The restroom accessories shall include 1 toilet paper dispenser, 1 paper towel dispenser, 1 soap dispenser, <br /> 1 mirror, and 2 grab bars as required by code. All accessories shall be ADA compliant and shall be <br /> stainless steel. The contractor shall be responsible for locating any blocking required for the installation <br /> of restroom accessories. <br /> 16. The restroom fixtures shall include 1 toilet, 1 sink, and 1 "hi -low" drinking fountain as required for ADA <br /> compliance. The contractor shall be responsible for locating any blocking required for the installation of <br /> restroom fixtures. <br /> 17. The scope includes new 2' x 4' ACT ceilings at 10' -0" AFF in the restroom and in the main room of the <br /> space. The ceilings will not have insulation. <br /> Structural <br /> 18. The scope does not include any work on the foundations, columns, beams, joists, roof deck, or trusses. <br /> The scope does not include any work on the structural components of the masonry walls. The scope does <br /> not include any structural work to the existing light gauge framing. <br /> 19. The scope includes saw - cutting the existing floor slab as needed to provide the new restroom. <br /> 20. The scope includes re- pouring any portion of the existing slab that is saw -cut. It also includes pouring a <br /> new slab in the area of the existing slab leave out at the rear of space D5 -D6. <br /> 21. All new slab pours shall be 4" thick 3,000 psi concrete. The top of all new slab pours shall be flush with <br /> the top of the existing slab. <br /> Fire Protection <br /> 22. The existing building has a fire sprinkler system with the heads turned up. The landlord's tenant build out <br /> contractor will turn down the sprinkler heads and reposition them as needed to fit the ceiling layout. The <br /> design of the sprinkler system will be handled by the contractor through their shop drawings. The <br /> contractor shall be responsible for determining the exact locations of all sprinkler heads and for <br /> _ .coordinating_vyith_all diNiplints. The contractor shall be responsible for signed and ___ <br /> sealed shop drawings as required for permitting. <br /> 23. Cuhaci & Peterson's scope as it relates to the fire sprinkler system shall be limited to schematic review of <br /> the contractor's shop drawings. C &P will review the shop drawings as a courtesy for coordination with <br /> other disciplines. C &P's scope will not include review of the shop drawings for code compliance or <br /> constructability. <br /> Plumbing <br /> 24. The scope does not include any work to any underground sanitary lines other than what is required for <br /> connection of new sanitary lines. The scope does not include any work to any existing clean outs. <br /> 25. The scope includes removal of any unused portion of existing above ground stub -ins far space D5 -D6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.