Laserfiche WebLink
Page 2 of 8 TFP312 <br /> 1 <br /> 7 Y 1" NPT <br /> 777 O <br /> —�— 1- 13116" <br /> 1 -Frame 8 A� ��6 9/16" (46,0 mm) <br /> 2- Deflector p��01 (14,3 mm) <br /> 3- Compression Screw 9 ����� NOMINAL ' = - , <br /> 4 -Hook _ 7' MAKE -I <br /> opr ...2.,... el <br /> 5 -Strut 6 ' 1 , <br /> 6 -Link Assembly III 3- 13116" i 7- Button (96,8 mm) <br /> 8- Sealing Assembly 5 THERMAL <br /> 9- Ejection Spring <br /> a SENSING <br /> WRENCH ELEMENT <br /> 4 FLATS <br /> C <br /> C <br /> 3 fa � _ <br /> 2 <br /> TEMPERATURE <br /> RATING 2" (50,8 mm) -- <br /> FIGURE 1, MODEL ESFR -25 EARLY SUPPRESSION FAST RESPONSE PENDENT SPRINKLER <br /> guidelines are not intended to provide <br /> Technical Design Criteria complete installation criteria. <br /> Data NOTE <br /> The National Fire Protection Associa- GENERAL GUIDELINES <br /> Approvals tion (NFPA) and FM Global (FM) pro- <br /> System Type: Wet l <br /> UL and C -UL Listed. FM and VdS Ap- vide installation standards that must y yp pipe system. <br /> proved. LPCB Approved (094b/01 & be used to properly design an auto- Roof Construction: Unobstructed or <br /> 0071/01). NYC under MEA 356 -01 -E. matic sprinkler system utilizing Early obstructed construction. For example: <br /> Maximum Working Pressure Suppression Fast Response (ESFR) smooth ceiling, bar joists, beam and <br /> 175 psi (12,1 bar) Sprinklers. The guidelines provided by girder, etc. <br /> NFPA and FM may differ; conse- <br /> Pipe Thread Connection quently, the appropriate standard must NOTE <br /> 1 inch NPT or ISO 7 -R1 be used for a given installation. Where the depths of the solid struc- <br /> Discharge Coefficient The following data sheets describe the tural members (beams, stem, etc.) ex- <br /> K = 25.2 GPM /psi / ESFR Sprinklers offered by Tyco Fire teed 12 inches (302 mm), ESFR <br /> (362,9 LPM /bar1/2) Products: Sprinklers shall be installed in each <br /> channel formed by the structural mem- <br /> Temperature Ratings TFP312 — Model ESFR -25 (TY9226), bers. <br /> 165 °F /74 °C or 214 °F /101 °C K =25.2 Pendent Sprinkler <br /> Ceiling Slope: Maximum 2 inch rise <br /> Finish TFP315 — Model ESFR -17 (TY7226), for 12 inch run (16.7 %). <br /> Natural Brass K =16.8 Pendent Sprinkler <br /> Building Heights, Storage Heights, <br /> Physical Characteristics TFP316 — Model ESFR -17 (TY7126), and Commodity: Refer to Table A. <br /> Frame Brass K =16.8 Upright Sprinkler Maximum Coverage a Area: <br /> Deflector Bronze TFP318 — Model ESFR -1 (TY6226), ) TY6226 100 ft (9,3 m In some cases, the <br /> Compression Screw P P <br /> Stainless Steel K =14.0 Pendent Sprinkler i nstallation standards ermit a greater <br /> Hook Monel The following general guidelines pro- coverage area. <br /> Strut Monel vided for ESFR Sprinklers offered by Minimum Coverage Area: <br /> Link Assembly . . . . Solder, Nickel Tyco Fire Products may be used for a 80 ft (7,4 m per NFPA 13, and <br /> Button Brass quick reference to help select the ap- 64 ft (5,8 m per FM 2 -2 <br /> Sealing Assembly propriate Tyco Fire Products' ESFR tin 1 2 feet ( 3,7 m ) for <br /> Maximum Spacing: g: <br /> Beryllium Nickel w/Teflon* Sprinkler: <br /> Ejection Spring Inconel building heights up to 30 feet (9,1 m), <br /> and 10 feet (3,1 m) for building heights <br /> *Registered trademark of DuPont. NOTE greater than 30 feet (9,1 m). <br /> In all cases, the appropriate NFPA or Minimum Spacing: <br /> Patents FM installation standard must be refer- 8 feet (2,4 m). <br /> U.S.A. Patent Numbers: enced to assure applicability and to <br /> 4,580,729 5,829,532 obtain complete installation guide- Minimum Clearance To Commodity: <br /> 6,059,044 6,336,509 lines, since the following general 36 inches (914 mm). <br /> 6,502,643 7,165,624 <br /> Patents pending. <br />