My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10544
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2011 2:53:33 PM
Creation date
3/22/2011 2:50:25 PM
Metadata
Fields
Template:
Building Department
Company Name
KEYSTONE CHLLENGE FUND INC
Building Department - Doc Type
Permit
Permit #
10-10544
Building Department - Name
KEYSTONE CHALLENGE FUND INC
Address
38826 4TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.5 The Contractor shall not assign this contract without written consent of the Owner and <br /> the Community Development Division. Any request for assignment must be addressed <br /> to the Community Development Division. <br /> 7.6 The Contractor at all times shall keep the premises free from accumulation of waste <br /> materials or rubbish caused by this work. <br /> 7.7 The Contractor shall permit the Community Development Division to examine and <br /> inspect the construction work under this contract at any reasonable time. <br /> 7.8 The Contractor shall furnish the Owner and the Community Development Division with <br /> the names, addresses, and telephone numbers of the firms to be contacted for service to <br /> the various appliances or other equipment that was installed or repaired under this <br /> contract. <br /> 7.9 The Contractor shall indemnify and save harmless the County, its agents and <br /> employees, and the Owner from liability for any injury or damages to persons or property <br /> resulting from the Contractor's prosecution of work pursuant to the provisions of this <br /> contract. <br /> ARTICLE 8. - GENERAL RESPONSIBILITIES OF THE OWNER: <br /> 8.1 The Owner shall permit the Contractor to use, at no extra cost, existing utilities such as <br /> light, heat, power, and water necessary for the proper execution and completion of the <br /> work. <br /> 8.2 The Owner and occupants shall cooperate with the Contractor to facilitate the perfor- <br /> mance of the work and are responsible for the removal or protection of rugs, furniture, <br /> and clothing, if necessary. <br /> 8.3 The Owner and occupants shall be responsible for the proper use and care of the <br /> property including all equipment and appliances. <br /> 8.4 The Owner shall provide the Contractor with access to the property during normal <br /> working hours on normal working days. <br /> ARTICLE 9. - GENERAL RESPONSIBILITIES OF THE COMMUNITY DEVELOPMENT DIVISION: <br /> 9.1 The Community Development Division shall provide general administration of the <br /> contract, but it is understood by all parties that the County is not a party to this Contract. <br /> 9.2 The Community Development Division shall make frequent inspections of the work while <br /> it is in progress to determine if it is proceeding in accordance with the contract docu- <br /> ments. <br /> 9.3 The Community Development Division shall have the authority to reject work which does <br /> not conform to the contract documents. <br /> ARTICLE 10. - CONTRACT DOCUMENTS: This contract consists of the Bid Proposal, the Work <br /> Write -Up, including any drawings or plans, the General Bid Specifications, and any insurance policies specified <br /> in Article 5 above. <br /> gs /construction work contract -3- Revised 8/3/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.