Laserfiche WebLink
SPEC. DESCRIPTION OF WORK LOCATION COST <br /> 19 FLOOR COVERING / CARPET <br /> The carpet shall be (30) ounce, stain resistant over a minimum <br /> • of inch rebond, FHA approved. The installation shall be in <br /> an approved manner. All tack strips, metal accessories, etc., <br /> are included in this specification. The carpet shall be first quality <br /> and with no seconds will be accepted. Product approval <br /> documentation will be provided by the contractor prior to <br /> installation. All rooms to be carpeted identically with the <br /> exception of the Kitchen, Baths, interior Washer/Dryer area. Entire House 1,630 <br /> 22 FLOOR COVERING / CERAMIC <br /> Install new ceramic tile floor. Assume cost of tile to be installed Kitchen 2,832 <br /> at $2.00 per sq. foot of area. Color to be selected by the owner. All Bathrooms <br /> Laundry Room <br /> Foyer <br /> 25 BASE & SHOE MOLDING <br /> Install new wood base and shoe molding on all walls <br /> in newly floored areas. When new base is installed <br /> over flooring, no shoe is required. All carpeted walls <br /> does not require shoe molding. All base and shoe to be primed <br /> on the back before installing. (Colonial style) Entire House 1,932 <br /> 26/27 WALL FRAMING SPECIFICATIONS -NEW STUD WALLS <br /> Build new interior walls as shown on the plan and specified in the <br /> 2010 Bid specs. Furr exterior walls with 1X2 pressure treated over <br /> the insulation board @ 16" O.C. New interior walls to be 2x4 @ 16" <br /> on center. See Plan 5,166 <br /> 29 ROOF FRAMING- GENERAL SPECIFICATIONS <br /> Roof framing and sheathing, as submitted and stamped by a licensed <br /> engineer, if trusses are used, installed as shown on the plan. All roof <br /> framing tied to walls with hurricane clips per SBC or IBC as called out <br /> on the floor plan. All sheathing to be 1/2" 4 ply CDX plywood. Entire House 9,244 <br /> 31 ATTIC VENTILATION <br /> Furnish and install ridge vents at all peaks. Exterior 371 <br /> PAGE TOTAL 21,175 <br /> CUM TOTAL 40,560 <br /> DATE: 05/13/10 Keystone Challenge Fund- Case # 09 -804 PAGE: 2 <br />