Laserfiche WebLink
SPEC. DESCRIPTION OF WORK LOCATION COST <br /> • 33 HIGH IMPACT WINDOWS <br /> Install new high impact white vinyl single hung windows insulated <br /> • complete with screens, as shown on the plan. Product approval must Exterior <br /> be submitted by the contractor at contract signing. Entire House 1,389 <br /> Egress windows (one per bedroom to meet code), can be high impact <br /> vinyl frame insulated single hung, slider, single hung with hinged <br /> door, or casement to meet the exit fire code. The windows to be high Exterior <br /> impact white frame with screen. See plan. Entire House 927 <br /> 36 EXTERIOR DOORS <br /> Furnish and install new doors to meet the wind code. The door frame <br /> to be composite material and a fiberglass door. The owner to select <br /> the design of the door. The cost of the doors with lever lock set is <br /> listed below. <br /> Front door- Cost $350.00 <br /> Rear door- Cost $250.00 <br /> Garage walk thru door — Cost $250.00 Exterior 1,270 <br /> 44 EXTERIOR SIDING — MASONRY FINISH <br /> Concrete block exterior finish -masonry finish per specs and plan. Exterior 3,880 <br /> 45 SOFFIT AND FASCIA <br /> Enclose all soffit with vented aluminum and enclose all fascia <br /> boards with new wood grain aluminum baked finish. Soffit and <br /> fascia to be white. Entire House 1,296 <br /> 48 GUTTERS AND DOWNSPOUTS <br /> Install new 6 " seamless gutters and proper number of downspouts <br /> at all eaves where water runoff from the roof occurs. White. <br /> Leaders and downspouts to be 3" X 4" with splash blocks included <br /> in price. Entire House 1,015 <br /> 50 ROOFING - GENERAL SPECIFICATIONS <br /> ROOFING - FIBERGLASS SHINGLES <br /> Install a new 30 year dimensional shingle roof per all requirements <br /> of the specifications and applicable codes. Shingles to be Tamko <br /> Heritage 30 or equal. The secondary water barrier is peel and stick <br /> over plywood before the shingles. The contractor to submit the roofing <br /> inspection affidavit upon the completion of the project. Entire House 5,100 <br /> PAGE TOTAL 14,877 <br /> CUM TOTAL 55,437 <br /> LATE: 05/13/10 Keystone Challenge Fyn& Case # 09 -804 PAGE: 3 <br />