Laserfiche WebLink
SPEC. DESCRIPTION OF WORK LOCATION COST <br /> • 50/51 ROOFING- GENEIIAL SPECIFCATIONS - CONTINUED <br /> Contractor to notify the Housing Specialist at the time of the roof <br /> • installation so pictures, of the substrate and water barrier installation, <br /> can be taken to verify compliance of specifications. Failure to notify <br /> could result in the roofing being rejected. Information Only 0 <br /> 54 WALL INSULATION <br /> In all new exterior walls, install insulation as required <br /> to achieve R -11 in frame walls and R -5 on masonry walls See Plan 1,065 <br /> 55 CEILING INSULATION <br /> Install insulation to achieve R —30 in pitched roof areas. Entire House 1,000 <br /> 58 INTERIOR WALL AND CEILING FINISH- DRYWALL <br /> Install new 1 /2" drywall on all walls and finish. The ceiling to get <br /> ceiling drywall to code and finish. The walls to get orange <br /> peel and ceiling knock down ready for paint. Include garage ceiling <br /> and framed walls. Install Wonderboard on all shower and tub walls. Interior 4,240 <br /> 62 INTERIOR WALL FINISH - CERAMIC TILE (THIN SET) <br /> Furnish and install new Wonderboard surround at tub to ceiling, <br /> and install new ceramic tile. Color to be selected by the owner. All Bathrooms 1,057 <br /> 63 FIXTURE SET <br /> Furnish and install a new ceramic fixture set. Color to be <br /> selected by the owner. All Bathrooms 85 <br /> 66 ATTIC ACCESS <br /> Install a ceiling access panel to minimum clearing opening <br /> of 22" X 36 ". Provide cover, and trim opening. Garage 45 <br /> 68 INTERIOR DOORS <br /> Furnish and install a new solid core panel door, frame, colonial <br /> trim, and lever lock set to match the design of the interior doors. Garage/Liv. Area 309 <br /> Furnish and install new pre -hung hollow core panel door and <br /> lever lockset set complete. See plans. All hardware- antique brass. All Interior Doors 800 <br /> Furnish and install new hollow core bi -fold panel doors. See plan. All Closet Doors 277 <br /> PAGE TOTAL $8,878 <br /> CUM TOTAL $64,315 <br /> DATE: 05/13/10 Keystone Challenge Fund- Case # 09 -804 PAGE: 4 <br />