Laserfiche WebLink
• <br /> 6/23/2010 ; PAUL DAVIS <br /> Estimate 7077 -P01 R E S T O R A T.I O N <br /> Total for Right Elevation: 7,264.69 <br /> Master Bedroom <br /> Main: <br /> Task Quantity Unit Price Sub Totals <br /> 23. Clean floor 205.69 SF 0.22 45.25 <br /> 24. Contents - move out then reset - Large room 1 EA 49.38 49.38 <br /> 25. Remove Interior door - Colonist - pre -hung unit 1 EA 16.31 16.31 <br /> 26. Interior door - Colonist - pre -hung unit 1 EA 148.52 148.52 <br /> 27. Remove 1/2" drywall - hung, taped, floated, ready for paint (1 -wall) 175.47 SF 0.41 71.94 <br /> 28. 1/2" drywall - hung, taped, floated, ready for paint (1 -wall) 175.47 SF 1.38 241.31 <br /> 29. Remove Acoustic ceiling (popcorn) texture 205.69 SF 0.42 86.39 <br /> 30. Acoustic ceiling (popcorn) texture 205.69 SF 0.67 137.77 <br /> 31. Texture drywall - light hand texture (2- walls) 321.69 SF 0.40 130.03 <br /> 32. Remove Baseboard - 3 1/4" (2- walls) 36.56 LF 0.43 15.72 <br /> 33. Baseboard - 3 1/4" (2- walls) 36.56 LF 2.46 89.90 <br /> 34. Door lockset - Detach & reset 1 EA 17.79 17.79 <br /> 35. Remove Furring strip - 1" x 2" - applied to concrete (1 -wall) 175.47 SF 0.46 80.72 <br /> 36. Furring strip - 1" x 2" - applied to concrete (1 -wall) 175.47 SF 1.08 189.81 <br /> 37. Remove Reflective multi -layer foil insulation R -7+ ( 1 -wall) 175.47 SF 0.17 29.83 <br /> 38. Reflective multi -layer foil insulation R -7+ ( 1 -wall) 175.47 SF 0.80 141.01 <br /> 39. Ceiling fan - Detach & reset 1 EA 144.59 144.59 <br /> 40. Remove Sill - cultured marble on 2" x 6" wall 6 LF 0.54 3.24 <br /> 41. Sill - cultured marble on 2" x 6" wall 6 LF 7.82 46.91 <br /> 42. Paint baseboard - two coats 73.11 LF 0.86 62.60 <br /> 43. Paint door slab only - 2 coats (per side) 1 EA 18.41 18.41 <br /> 44. Paint door /window trim & jamb - 2 coats (per side) 1 EA 18.40 18.40 <br /> 45. Mask and prep for paint - tape only (per LF) 73.11 LF 0.34 25.11 <br /> 46. Seal then paint the walls and ceiling (2 coats) 790.58 SF 0.55 434.11 <br /> 47. Window blind - horizontal or vertical - Detach & reset 2 EA 26.68 53.36 <br /> Total for Master Bedroom: 2,298.40 <br /> Master Bath <br /> Main: <br /> Task Quantity Unit Price Sub Totals <br /> 48. Remove Cabinetry - full height unit 1.83 LF 7.81 14.29 <br /> 49. Cabinetry - full height unit 1.83 LF 264.64 484.29 <br /> 50. Remove Cabinetry - lower (base) units 4.08 LF 6.94 28.32 <br /> 51. Cabinetry - lower (base) units 4.08 LF 158.25 645.65 <br /> 52. Remove Medicine cabinet 1 EA 15.61 15.61 <br /> 53. Medicine cabinet Medicine cabinet matches base and full height 1 EA 156.73 156.73 <br /> cabinets \OA <br /> 54. Clean floor 40.91 SF 0.22 9.00 <br /> 55. Remove 1/2" drywall - hung, taped, floated, ready for paint (2 -wall) 127.19 SF 0.41 52.15 <br /> 56. 1/2" drywall - hung, taped, floated, ready for paint (2 -wall) 127.19 SF 1.38 174.91 <br /> 57. Remove Acoustic ceiling (popcorn) texture 40.91 SF 0.42 17.18 <br /> Paul Davis Restoration, Inc. of Pasco and Hernando FI. License CBCO51266 <br /> 7944 Rutilio Court, New Port Richey, FI. 34653 888 -PDR -FIRE <br /> 2 <br />