6/23/2610 � ® PAUL DAVIS <br /> Estimate 7077 - P01 R E S T O R A T. 1 O N <br /> Master Bath continued... <br /> 58. Acoustic ceiling (popcorn) texture 40.91 SF 0.67 27.40 <br /> 59. Texture drywall - light hand texture (walls) 211.99 SF 0.40 85.69 <br /> 60. Remove Baseboard - 3 1/4" (2- walls) 15.9 LF 0.43 6.84 <br /> 61. Baseboard - 3 1/4" (2- walls) 15.9 LF 2.46 39.10 <br /> 62. Remove Furring strip - 1" x 2" - applied to concrete (1 -wall) 63.6 SF 0.46 29.26 <br /> 63. Furring strip - 1" x 2" - applied to concrete (1 -wall) 63.6 SF 1.08 68.79 <br /> 64. Carpenter - General Framer - per hour Above charge is for re- framing 12 HR 53.55 642.60 <br /> interior walls (2x4x8 studs) that were damaged during impact. 2 -guys <br /> 6 -hours each. Charge includes material \OA <br /> 65. Remove Reflective multi -layer foil insulation R -7+ ( 1 -wall) 63.6 SF 0.17 10.81 <br /> 66. Reflective multi -layer foil insulation R -7+ ( 1 -wall) 63.6 SF 0.80 51.11 <br /> 67. Countertop - cultured marble - Detach & reset 12 SF 5.70 68.40 <br /> 68. Sink faucet - Detach & reset 1 EA 58.69 58.69 <br /> 69. Plumber - per hour Above charge covers plumber for 2 trips for a rough 16 HR 65.17 1,042.72 <br /> and final. 2 -guys 4 -hours first trip / 2 -guys 4 -hours 2nd trip. \OA <br /> 70. Toilet - Detach & reset 1 EA 120.69 120.69 <br /> 71. Paint baseboard - two coats 15.9 LF 0.86 13.62 <br /> 72. Paint door slab only - 2 coats (per side) 1 EA 18.41 18.41 <br /> 73. Paint door /window trim & jamb - 2 coats (per side) 1 EA 18.40 18.40 <br /> 74. Mask and prep for paint - tape only (per LF) 26.5 LF 0.34 9.10 <br /> 75. Seal then paint the walls and ceiling (2 coats) 252.9 SF 0.55 138.87 <br /> Total for Master Bath: 4,048.63 <br /> Master shower <br /> Main: <br /> Task Quantity Unit Price Sub Totals <br /> 76. Shower curtain rod - Detach & reset 1 EA 12.45 12.45 <br /> 77. Remove Fiberglass shower unit 1 EA 65.00 65.00 <br /> 78. Fiberglass shower unit 1 EA 604.24 604.24 <br /> 79. Tub /shower faucet - Detach & reset 1 EA 101.72 101.72 <br /> 80. Remove Ceramic tile 38.16 SF 1.69 64.49 <br /> 81. Ceramic tile 38.16 SF 10.78 411.18 <br /> 82. Remove 1/2" Cement board 38.16 SF 0.73 27.86 <br /> 83. 1/2" Cement board 38.16 SF 2.89 110.27 <br /> Total for Master shower: 1,397.21 <br /> Back Bedroom <br /> Main: <br /> Task Quantity Unit Price Sub Totals <br /> 84. Clean floor 138.97 SF 0.22 30.57 <br /> 85. Contents - move out then reset - Large room 1 EA 49.38 49.38 <br /> 86. Remove 1/2" drywall - hung, taped, floated, ready for paint (2- walls) 271.87 SF 0.41 111.47 <br /> 87. 1/2" drywall - hung, taped, floated, ready for paint (2- walls) 271.87 SF 1.38 373.88 <br /> Paul Davis Restoration, Inc. of Pasco and Hernando FI. License CBCO51266 <br /> 7944 Rutilio Court, New Port Richey, FI. 34653 888 -PDR -FIRE <br /> 3 <br />