My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-10792
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-10792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2011 8:59:37 AM
Creation date
3/23/2011 8:58:24 AM
Metadata
Fields
Template:
Building Department
Company Name
VASO ENTERPRISES LLC
Building Department - Doc Type
Permit
Permit #
10-10792
Building Department - Name
VASO ENTERPRISES LLC
Address
5911 FOREST LANE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:ZEPHYRHILLS :FIRE :DEPARTMENT Z` H E _ - <br /> 6907"Dairy"Road', Zephyrhills,'FL 33542 <br /> s r - <br /> Fire Chief Keith VXJilJiams .- Bus (813)780 -0041 Fax (813)780 - 0044 <br /> -FIRESERVICE :USER FEES <br /> Occupancy No.: <br /> Plan No.: /6 -119& C ontractor 's / /_e`- %/0Z-1 <br /> Business Name: Billing Address: <br /> Business Address: ".� crg73 / 'p j <br /> Business Phone No.: Billing Phone No.: 1 <br /> Business Fax No.: Billing Fax No.: I <br /> Contact: Contact: <br /> PLAN REVIEW FEES _ INSPECTION FEES _ PERMIT FEE • I _ <br /> Site Plan N/C FALSE ALARM FEE <br /> _ _ Annual N/C _ Sprinkler . '$ 5 d — `1st Alarm N/C <br /> ric _ Multi - Family /Commercial .06 sf _ '1st Re- inspection N/C `Standpipes $5a — 2nd Alarm N/C <br /> 1 (Minim Charge $25.00 _2nd Re- inspection. $100 _Fire Pump $5 : 3rd Alarm N/C <br /> 0 Plan Revisions DBL _ 3rd Re- inspection $250 _ Hoods $50 4th Alarm $100 <br /> _ 4th R0 Fire Alarm $50 <br /> e-Inspection $50 :5th Alarm 5150 <br /> SPRINKLER SYSTEMS (Business closed until LP Gas 5501 — :6th Alarm : 5200 - <br /> _ 0 -25 Heads $50 violations corrected) as 5 <br /> Natural G50 — NON COMPLIANCE $150 <br /> 26 plus Heads $100 _ SPRINKLER.SYSTEMS _ Fuel Tanks - per tank $501 <br /> STANDPIPE SYSTEM . Hydro Undergrounds 545 Sparklers $100 <br /> 0 Per Riser $50 Hydrostatic Test 565 per system _ Fire Works 5500 <br /> FIRE PUMP _ Acceptance Test' $45 per system _ Camp Fire $251 <br /> 0 Per Pump 5100 _ Hydrant Flow $75 " _ Controlled Bum $100 <br /> FIRE ALARM SYSTEM Hood/Duct 550 1 <br /> ._ 0 -25 Devices 5 50 _ FIRE ALARM SYSTEM ' Place of Assembly $501' Annual <br /> 26 plus Devices $100 _ System Acceptance . $50 _ Fire Protection - 5251 <br /> SUPPRESSION SYSTEMS — Recall Acceptance $50 _ Flammable Application 550 Annual <br /> _ Wet $5 OTHER Waste Tire Storage g 550 Annual <br /> Dry $50 _ Fire Wail /Smoke Wall $15 per wall Generator < KW $10 <br /> _ CO2 550 _ LP Gas 525 per — <br /> Generator >30 KW 150 <br /> Other 550 Natural Gas 525 per system _ Bio Hazard Waste slop, Annual <br /> KITCHEN EXHAUST _ Fumigation Tenting $501 <br /> Hood/Ducts _ g�ter 515 perten _ Torch Pot/Applied 5501 <br /> $50 Tent 10'x10' or <br /> OTHER _ Fire Pump $45 — <br /> Haz. Materials $100, Annual <br /> LP Installation per tank 550 Fire Suppression $30 1 <br /> L _ . <br /> Fuel Tank Installation 550 _ System Acceptance <br /> (Per Tank) 550 Exhaust Hood/Duct $30' • <br /> 0 Natural Gas Installation $50 - Re - inspection DBL I <br /> (Per System) (other than annual) _ <br /> 0 Spray Booth 550 0 Inspection scheduled DBL _ I <br /> and cancelled less than'. <br /> 24 hours — 1 <br /> - Construction Insp. N/C <br /> 114: —_ Emergency Vehicle Aa 550 • 1 FALSE ALARM <br /> PLANS TOTAL I j /CNSPECTION TOTAL PERMIT TOTAL I TOTAL <br /> w 1 <br /> GRAND TOTAL ' ' '/ '1z....1 <br /> Comments: <br /> Date: / IF <br /> Ins% : I�,3 :r <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.