Laserfiche WebLink
8 Wall Flashing <br /> Sheathing --1.- +— Siding <br /> 5" (127mm) Minimum Metal Flashing (Nailed to the deck, not to vertical side wall) <br /> rt <br /> Cap shingle — Do Not Nail. <br /> 44441/141443/4,1/ Install with asphalt plastic cement <br /> Asphalt Plastic Cement <br /> -41-- Shingle <br /> Roof Deck --imp- <br /> 9 Chimney Flashing <br /> Non-corroding metal counter - Cricket on <br /> flashing to extend down over <br /> high side of <br /> base Clashing bib., -, chimney <br /> . <br /> Non-corroding metal base aasNng. <br /> .. One piece step fleshing toe each course. <br /> 4 � 4 Cement in place and nail with 2 nails. <br /> ' Of / Bond oadyirg shingles in asphalt plastic cement <br /> I j��r1���jji /j. <br /> 4,■■4;*4 , . ? ■ <br /> 1 4 I �1 '� ,ii a 4 I • <br /> 4 ■4 4 * * 41 4 • <br /> 1 O <br /> Valley Construction - Closed or <br /> Woven Valley <br /> Center a full 36' (914mm) width of Weather Center full width roll No fasteners within 6' (152mm) of center fine <br /> Watch', StormGuard• or other GAF - Elk Leak of Weather Watch*, StormGuarda <br /> Barrier over entire valley length to seal the or other GAF -Elk Leak Barrier Valley center line <br /> valley. Lay Shingle - Mate• or other GAF - Elk [6' (152mm) end laps] in valley. Extra fastener in <br /> underlayment into the valley and overlapping end of shingle <br /> the Leak Barrier a minimum of 6' (152mm). <br /> Design the valley for water flow over the �rf < <br /> trimmed shingle by Installing the valley 4 t s;� +� <br /> beginning with the roof plane that has the lower r "' r Clipped comer set e <br /> . ,#, .. k ..: -.- 1:7 . ; `;r asphalt plastic cement <br /> slope or lesser height. Extend the bottom <br /> shingles 1Y (305mm) past the valley center k . <br /> line. Use normal shingle fastening methods (no ° . ... ' t,n. • <br /> fasteners within 6' (152mm) of valley center Via t "< x. „' <br /> Tine two nails at the shingle's end). Continue to Run starter strip and <br /> the top of the vat In ttie same manner. Trim � 4 :.:x • ; first shingle course <br /> shingles Y (51mmj back from center line � � � 11, only across va <br /> on top roof plane. Clip shingles after the �� � �•,�� � mum <br /> 12`(305mm) m <br /> cut to keep water flow In the valley center. Seal ins underiayment .� <br /> the valley using plastic roof cement: seal the Beak bad over *� .�'' .� ti M �•. <br /> vatic shin glee: to each other for the best .W110 I" 1 �. fit,. • <br /> prote shingle io �N, (Not Excess cement can cause . , . • - . <br /> • •• •sr <br /> Shingles trimmed 2' (51 mm) back from valley center line <br />