Laserfiche WebLink
1 Underlayment: Standard Slope -4/12 (333mm/m) or more 1 Underlayment: Low Slope 2/12 -4112 167mm- 333mm/us) <br /> a <br /> Applicatioh of underlayment: Cover deck with one layer of underlayment installed Application of underlayment and eave flashing; Completely cover the deck with two <br /> without wrinkles. Use only h nails to hold underlayment in place until covered by layers of underlayment as shown. Use only enough nails to hold underlayment in place <br /> shingles. Application of eave flashing:. Install eave flashing such as GAF -Elk Weather until covered by shingles. Use blind nailing for eave fleshings. At eaves and where ice <br /> Watch', StormGuard', or other GAF -Etc Leek Barmier in localities where leaks may be caused dams can be expected, use one layer of GAF Weather Watch•, StormGuard• or other <br /> by water backing up behind lee or debris dams. Ease flashing must not overhang the eave GAF-Elk Leak Barrier. Eave flashing must not overhang the roof eave edge by more <br /> edge by more than 1!4' (6mm) and extend 24' (610mm) beyond the inside wall line. than 114' (6mm) and extend 24' (6TOmm) beyond the inside wall line. Where ice dams <br /> or debris dams are not expected, install 2 pies of Shingle -Mate• underlayment. <br /> 4' (102mm) f, Weather Watch*, StormGu.rrd, Y to 4' <br /> 17 (305mm) perk or other GAF -Elk Leak Barrier (51mm to 102mm) i <br /> 17 (305mm) <br /> . see Bon 1e ��- i� or other er Witch*. Leak Barrier <br /> i W Weather GAF-Ere Leak Goord <br /> Minimum Slope For lower slopes <br /> NI sneerer am 3s• (91amm> ..�� � � ., � A0 sheets ere 3/C (914mm> % 'R •$� `� <br /> wide Shingle- Mate'or ' �. p +' ® ) \9 wide SMn F-Dk undede }� ' / 0 <br /> other GAF -Elk unded meat a F �� or othr u^de�Y^ur ^L ""3 y sheets <br /> � N. +s � ,* F � f Up t01 /4'(6mm) root overhang ' ' �^ + � � -- S �'�/ Y 151 mmj side la Rake drip edge — � % t I 1�8' 4SSmm <br /> �.?'l •i � c p ) <br /> Along rake. place drip edge on top Z .Z. \� double covemga. <br /> of underlayment / e (102mm) end lap ) <br /> Up lo1/4' (6mm) root overhang Eave edge <br /> Along eave, put underleyment on top of metal drip edge. <br /> Z Starter Course aj First Course <br /> Apply as shown. Note: GAF -Elk starter strips with sealant are recommended at the v Start and continue with full shingles laid flush with h the starter cotrse Shingles may be laid <br /> eaves and rakes for best performance and required for the best limited wind warranties from left to right or right to left. 60 NOT lay shingles straight up the roof (raddng) since this <br /> on certain products (see limited warranty for details). procedure can cause an Incorrect color blend on to roof and may damage the singles. <br /> Sect a ano n's and leyin either d scion Phce shingles close together <br /> don <br /> but but taowd <br /> .E Continue win lull -length . h . NI <br /> . : " . ,. > trimmed shingles a z s .. . : Slanrcaaae <br /> Melte Dip Edge - - y U. '. ter f,_ $ <br /> , - ' • - ' Pkm NnpN 1i4' -314' '1 q �Y Continue <br /> For maximum wind resistance Yong rakes, Ins WI any /\ / hal t .. - - ( cod rake e dges s � ;` . <br /> GAF -Elk starter any containing sealant or cement a r - to world. MO W o <br /> . Shingles <br /> shingles la unMdaymanl and each other N • 4' O.'' g First Course <br /> (102mm) width of esphdl plastic cement - ale 4 >bip, pracu a off <br /> Trim 5' 1152mm) b 7' (178mm) from end a first sh la stettr course shingles. <br /> then phut. end nth as \ <br /> Seediest mum with whole shingle <br /> sham, 3' to 4' (75mm placed 114 (6-19mM) r NM <br /> N <br /> to 102mm) From awe emirate. edges to provide drip edge. <br /> A Second Course Third Course <br /> Start and continue second course as shown. Trim 6' (152mm) from the end of the 5 Trim 11' (279mm) from the first shingle in the course: then continue with full shingles <br /> shingle. Position the shingles in the second and subsequent courses flush with the 11 across the roof. Strike a chalk line about every 6 courses to check parallel alignment <br /> of the wide cut -outs. This results in a 5' (127mm) exposure. Continue with full wi 1 1 with eaves. NOTE: Shingles may be laid from either left or right-hand side. <br /> shingles across the roof. <br /> u � : x <br /> i t �iN <br /> ^$y, . A , <br /> g��- sit -- ` <br /> ma y T4 � ; ( � A' F 4 <br /> �� � ,, c . : ::gi00 C �� � � . <br /> Second Course \�� .. ® . <br /> ,Y.' ,\ <br /> /r ■, 4 .O Course • , �_, ,.: . <br /> Trim Shingle r I . ` a• ' <br /> 6' (152mm) s e <br /> s <br /> Fourth Course and Remaining Courses rr Hip and Ridge <br /> Trim 17' (432mm) from first shingle In the course, then continue with full shingles Ins GAF -Elk 1imbertexe, Midge, Seal -A- Ridge', or Ridglass• hip and ridge shingles <br /> across the roof. Fifth and subsequent courses; repeat Steps 3 through 6. (check regional availability).Follow the application instructions shown on the hip and <br /> ridge wrapper. <br /> Fit Course <br /> .er6' . <br /> Ai$ Fu1 Sldn <br /> Fourth Course ` $� +. \ .- . /Y'0 . .. a; + <br /> Trimmed Shingles s s _eel. t t. „\ . <br /> : . . <br />