Laserfiche WebLink
jisr ® <br /> wil <br /> Labor bert <br /> GAF MATERIALS ; • <br /> CORPORATION SBS elf•A Bring Roofing g System <br /> How Do l Prepare for a Liberty' Project? <br /> Before You Start... the installation of your new Liberty` S1S Self- Adhering Roofing, do the following: <br /> • Read Instructions Thoroughly... and understand how the entire system works before starting your installation. <br /> • Understand The Materials... know when and where to use each component, why each is necessary, and the common mistakes to avoid. <br /> • Contact GAF Contractor Services... at 1- 800 -ROOF -411 for detailed information on specific applications or consult the technical specification <br /> for dialled application instructions. <br /> Do's And Don'ts,.. Liberty . SBS S,:lf- Adhering Roofing Systems are designed to be installed over low sloped roof decks. <br /> • Do Install On Roofs Between 1/2" And 6" Per Foot... and backn_it the Liberty Cap Sheet when the slope is greater than <br /> 1" per foot. Contact GAF Contractor Services at 1- 800 -ROOF -411 for fastening requirements specific topur project. <br /> • Do install In Moderate Temperatures.,. bete, ern 45'F (7 C) and 95•F (35°C), to assure proper adhesion and Bastes work conditions. <br /> • Do Follow Proper Storage Recommendations... Keep material skein and dry. In cooler weather. 24 hours prior to application <br /> store at 55°F (12.8 °C) for best installation result. Look for these important <br /> • Do Install Over Clean Surfaces... that are free of dirt, moisture, debris, damage or are otherwise unsuitable safety sgmtiol3 <br /> for installation. <br /> umi <br /> • Don't Work Alone... GAF recommends between 2 and 4 people to install Liberty SBS Sell- Adhering Rcofing. Wear Glasses <br /> SAFETY FIRST.. Protect yourself and others. Consider the following common sense safety precautions, including: <br /> • ''dear appropriate clothing. including protective footwear, eye wear and gloves. mar Gloves <br /> • Be aware of your surroundings. Watch for pc:: er lines when working near ladders and use common sense on your job .tc. <br /> • Follow local buddi c:,des. Common <br /> • Bend at the knees. Never lift with your back. Mistakes <br /> and How to <br /> Precautionary Note: The application Instructions for this product require the use of primers, adhesives or cements that contain ' Avoid Them <br /> solvents. Apply solvent -based products ONLY as instructed. Excess application of solvent -based products may affect the performance -- <br /> of this product, delay application of the cap sheet, cause surface blistering of the cap sheet or rest* In the asphalt flowing, dripping or <br /> staining. You may notice unpleasant odors from the solvents, which will dissipate when the solvent - based product has dried. <br /> What Tools & Equipment Do I Need to Install a Liberty' Roof? <br /> 1 r.. �c <br /> i \ 1111 ( \ <br /> O <br /> I <br /> Trove( Gloves _ Hammer Utility Knife Weighted Roller Brush Tape Measure Caulk Gun Liberty Installation Kit <br /> Liberty" Roof Materials... What Do l Need to Install a Quality Roof? <br /> • Liberty Installation Kit.,. comes k• ith enough primer and cament to install approximately 200 square feet of membrane. <br /> Additional kits or extra primer and cement may be purchased if necessary, <br /> • Liberty's Self- Adhering Base/Ply... Is the base wealhorprbofing layer when applied over acceptable, prepared decks <br /> or insulations. Each roll cortains approximately 200 f quare feet. <br /> • Liberty" Mechanically Attached Base... is applied when the duck is unsuitable, for self- adhered sheets or v.hen a nailed <br /> base sheet is preferred. Each roil contains approximately 200 square feet. <br /> • Liberty Self- Adhered Cap.,. is the first line of delense from the weather. Each roll contains approximately 100 square feet. <br /> • Metal Flashing... for covering roof perirr.eter edges. Metal fleshings are typically sold in 10 fool sections and must be primed <br /> with asphalt primer and allowed to dry before installation. <br /> • Everything Else... when measuring, note the. size and number of vent pipes, and other fleshings. Don't forget any nails, lumber <br /> or other additional materal that you may need. <br /> Liberty" Roof Systems... Which roof is right for me? <br /> 2 -Ply Lay -out (SA Base) 2 -Ply Lay -out (MA Base) 3 -Ply Lay -out <br /> h H117e1E' Al" Mailable Out A Z r -. __ <br /> !MINION pp. , MAMMA OW <br /> sex <br /> it rfr .1 ,;(-1 l <br /> ; . VI" <br /> / 2- / f MIA LAP / 1r - -- tie ".• <br /> ri : i : Min / Abu / I ^ ' , / Iwr � _ <br /> r H L t '/ // Hir' ert I <br /> � ' 1' 11�1Y I f- �• v � e � /•1M4• PMM <br /> . 0 ^ I•Ma <br /> lMEe7r LA MY' • UMW UMW Wt , , <br /> IN [.M INSET CAI PRET MA Raft PAM COt hmA 11UM•Mt eta r PAY 1 - r FT p1 p exec MT <br /> ( Sinnie Ply application not shown; visit www.c•af.com for d G aits if required j <br />