My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11435
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-11435
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:53:05 PM
Creation date
10/18/2011 2:53:03 PM
Metadata
Fields
Template:
Building Department
Company Name
PARKHILL
Building Department - Doc Type
Permit
Permit #
11-11435
Building Department - Name
KUFFER,WILLIAM & JANET
Address
6023 16TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 1 - Preparing for a Liberty" Roof... Is the Surface Ready? -- t6" ---I--- -' s" <br /> • Remove All Existing Roofs... and de 'ermine the suitability of the. existing roof deck Alternately, — I <br /> Liberty'' t'A base may be installed over certain roof types or deck types not listed Contact GAF <br /> Contractor Services at 1-800-ROOF-411 for more information <br /> • <br /> Inspect The Deck... and determine whet type of preparation is required. Replace damaged dec i <br /> materials as necessary. <br /> 9" <br /> • Install Insulation (if desired)... using GAF DRILL -TEC'" screws and plates or GAF approved adf as.ves. - - f <br /> Use minimum 1/2" thick Energy Guard Polyiso insulation weh epproved fiberglass or paper facer. 131/8" <br /> // Acceptable Decks <br /> 15/32" Minimum Plywood... Apply light asphalt prirner at 1/2 to 3/4 gal per 100 sq, ft. <br /> GAF EnergyGuard Polylso Insulation Instalt Self - Adhered Liberty Base Sheet directly to insulation ; <br /> tether DeckTypes May Be Acceptable Contact GP Contractor Sceeices at 1- 800 - ROOF -411 for more informafioni - -- - 1 ` -- - <br /> Common Mistakes (and How to Avoid Them)... Figure 2 - (Fastening) <br /> • Poor Roof Drainage... can lead to leaks at the seams. Before installation. fix the roof deck at ue. - wc.ru. <br /> locations when water remains after 48 hour, <br /> 8 • Not Priming he Deck... or metal may lead to poor adhesion and is a leading cause of problems. t °rlalul <br /> 9 Y P 9 p IA Wp Mae, W l•nWWtl• <br /> • Not Followin Proper Storage Recommendations.., Be sure rolls are elored at 55 F for 24 hours prior M"atm °".w c.r. by <br /> g P g P iMH4taemle <br /> to application. `'D <br /> CI'• Minsk e"•rn M 45" <br /> STE 2 - Installing Liberty" Base Sheet... nailed base or adhered base? O•d.MNI .01 ;f <br /> 1. Align Base Sheets... Starting at the lowest pc nt of the roof where there are gutter or fascia edges, e <br /> ® ` r M" <br /> the bare; sheet over and down the fascia fully behind the metal edge or Rutter height, fastened along roof '' <br /> edge and along fascia 9' o.c. Minimum overhang is 1 ". Begin with 1/2 width (19 11/16 ") sheets in 2-ply <br /> syst ens. Line 1/3 width (13 1/8 ") starter sheets in 3 -ply systems and install 2 ' ply (inierplysheet) <br /> .... 3)"1 ++ ••'' starting wi i)2 v idth ( 19 11/16") sheets to main side lap offsets. Ilk. <br /> i <br /> 141 2. In MA Base S heet (Where Required) usin nails with 1" cap heads. Fasten every 9 in the lap % � <br /> and stagger 2 roes in the field very 18 ( Figure 2-1). Cover tee entire roof area. <br /> 3, Install SA Base Sheet by aligning sheets properly before removing the release liners. Roll out sheet \® ' , nvr401 nataYi.r"' <br /> and let it sit or relax for at least 30 minutes to minimize the potenti. l for wrinkles that can form during r` ""dt rm �" <br /> al.m <br /> installation. Remove one side of the release liner at a time. `f� ''11 <br /> 4. Overlap Following Rows of Base Sheet... horizontally (side lap) by using the line found on the base / 1 <br /> sheet. Remove release films from top and bottom half of sheet in turn, carefully rolling beck into position <br /> to maintain overlap Where no line is present, overlap by S ". Overlap vertically (end laps) by at least 6 ". <br /> Make sun. all end laps are at lent 18" apart. Figure 3-1 (End Lap) <br /> 5. Roll Base Sheet Into Place (SA Base Only)... using a eeighted lawn or linoleum roller. This irnproves <br /> adhesion to the deck and ensures properly eealed laps. MusD rre•riweeq, ar.4'DWI. e« <br /> NOTE: r'. base sheet is not required; visit ww.v.r atcom fur more information. i•inel.".r Move a5, 5a UMW e Nrie-MMtlt <br /> q •� �Ite, nr°In4tl <br /> Common Mistakes (and How to Avoid Them)... <br /> • Not Letting The Liberty Sheets Relax... can lead to wrinkles. In colder weather, the rolls require more �✓ a / edema <br /> time to flatten and return 10 adequate installation temperature. / "wnr'Gjtei• <br /> i n i <br /> • Not Rolling The Base Sheets... Is a leading cause of opening laps. -'.Prays pay close attention to lips when -- <br /> " -- <br /> rolling the base sheets. 4 ''• i /® L WM , „ <br /> NOTE: Nu rer install wet or damaged material. Only install membrane hen temperature is 45 F and rising. j \ 1207 f° °x"'" <br /> 4a` 1h ' � Dumps 3'0.C. Snowed <br /> STEP 3 - Installing Liberty'" Cap Sheet... Where Do I Begin? ��� , <br /> 1. Install Edge Flashing... over the base sheet in a 1 /8" bed of cement and stagger nail with two roses of 'th \ i>b•m'ute nem <br /> �^ gy p roofing nails, 3' o.c. Prime the face on the roc and allow to dry before installing cap sheet. �.� 14. <br /> "' 2. Align Cap Sheet .. 1/4" from the edge at iho Iov.ostpoint of the roof. Rollout and position lull nr,tntTreaNdWen <br /> width (39 318 ") sheets with the selvage edge on the high side of the roof. Allow shoot to relax loiter M..Wolwlll r.n.nsd wr°re•.rr <br /> for at least 30 minutes prior to installing. Edge Flashing <br /> 3 Overlap Following Rows... horizontally (Side Lap) by alining with the bottom of the selvage edge. <br /> Vertical (End Laps) must be overlapped by at least 6" ailc�appfied in a 1/8" bed of Leak Busier M1 Satrix Shingle a \rl .t"4M <br /> #201 SBS Cement. Make sure all end laps are at least 1E' apart and ha\ o clipped comers (Figure 3-1). aMnere. <br /> GAF recommends installing a bead of plastic cement along the step up length of the lap. \ - <br /> 4. Remove Release Films... from top to bottom half of shut in turn, carefully rolling back Into position \ <br /> to maintain overlap. Remove selvage edge release film prior to installing bottom half of sheet and re•ie er. <br /> finishing the side lap. Pens. re., <br /> 5. Roll the Cap Sheet Into Place... using a minimum 50 lb weighted roller. This improves adho -'on to twee — <br /> the base sheet and ensures properly sealed laps. Wit i a ".a <br /> Co Mistakes (and How to Avoid Them)... <br /> seer mile " <br /> 8 • Not Priming the Edge Metal... can cause the cop sheet to peel away at the edges. Always prime � +r <br /> edge metal before installing cap sheet, +2 <br /> Warms \ <br /> • Not Applying Cement at the End Laps... Can cause laps to open. All locations :h' - sheets extend le inn• 1... .. " <br /> a ��. <br /> over gray lies must be set in cement. l e e- — <br /> tlaelne Wiwi .. <br /> STEP 4 Cleaning Up and Maintaining Your Liberty'" Roof... M.V. "oi <br /> 2 w u of x m h"e"m <br /> le <br /> • Remove All Tools and Materials From the Roof,,. and meke sure there is no debris that can slo.. or ■ n 5 ^rrr• `, ads° :�Mra..n' <br /> stop lire flow of water. <br /> • Dispose of Materials Property nT"on4°.a ... following all federal, state and local la s. Shingle Tie-In <br /> • Inspect the Roof Annually... and remove any leaves, branches or vegetation that may be present. Luok <br /> for other damage and repair if neoessar <br /> IS <br /> • Keep Gutters Clean... to ensure proper water flow and minimize the possibility of damaging ice dams. II 11 <br /> SBS Self - Adhering Roofing System <br /> !%2006 GAF Materials Corporation £ +J6 RESL7108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.