Laserfiche WebLink
3 <br /> Inspections Required: <br /> 1. Firewall and rated ceilings - screw inspection <br /> 2. Firewall and rated ceilings — final inspection <br /> 3. All penetrations through any fire ratings <br /> 4. Elevator <br /> 5. Final <br /> 6. Fire alarm, fire sprinkler, standpipe, hood/duct, hood suppression will be <br /> inspected under those separate permits. <br /> NOTE: For inspections on rated assemblies (walls and ceilings) and penetrations, <br /> building shall be completed in sections. Example: Bldg 1 Walls - 1 S floor, Bldg 1 <br /> Electrical Penetrations, etc... <br /> i <br /> KERRY B , FIRE MARSHAL <br /> ***Please be advised this review of plans submitted is a cursory review to assist the contractor in <br /> compliance with applicable fire safety codes. This review is not intended to be a final approval of the <br /> submitted plans. It is the contractor's sole responsibility to ensure that the plans are in complete compliance <br /> with all applicable NFPA codes and local ordinances. In the event that further examination or site <br /> inspection reveals azeas of non-compliance, it shall be the contractor's sole responsibility, at their sole <br /> expense to bring those areas in compliance. The City assumes no responsibility for the contractor's failure <br /> to be in compliance with all applicable NFPA codes and local ordinances. <br />