Laserfiche WebLink
7. Ground shall be scraped and cleared with a rock base under and around tanks to <br /> prevent any grass. <br /> 8. Proper signage/placards shall be provided on fence designating propane on site. This <br /> shall also be on tank. <br /> 9. Any electrical on site to be completed shall be compliant to NFPA 70 for such <br /> application. <br /> 10. Lines shall be color coded at site. <br /> 11. Saddles shall be engineered to ensure they can carry the load capacity of the tanks, <br /> documents shall support this. <br /> 12. Any venting shall also be shown in the piping or tank schematics/plans. <br /> 13. Provide contact information for individual at State level who gave preliminary approval. <br /> Additional Items may or may not present themselves once plans and documentation <br /> is submit for the review/permitting process. <br /> This item is tabled until a complete application has been submitted per the <br /> above comments. <br />