Laserfiche WebLink
i <br /> � <br /> � � <br /> Install thermostat 1 ' <br /> Total HVAC $24pp � <br /> Description Qty Unit Cost Total � <br /> --------------------------------------------------------------------------------------------------------------------------------- � <br /> Electrical � <br /> Electrical system complete 1400 sf <br /> New 2x41ay-in lighting 16 ea <br /> New tenant panel 1 ea <br /> Relocate emergency/e�cit lights 2 ea <br /> Electrical outlets 10 ea <br /> Install new emergency in restroom 1 ea <br /> Total elecirical $5000 <br /> Concrete <br /> Pour remaining slab 200 sf <br /> Total concrete $gpp � <br /> Fire Surinkler Svstem <br /> Turn down heads on existing system 1 ea <br /> Total fire sprinklers $1400 <br /> Painting <br /> Interior painting -restroom and 1 door $200 <br /> Misceilaneous <br /> Install HDCP accessories 1 ea $400 i <br /> Fire alarm testing $230 <br /> Contractor fee & overhead 1400 sf $3500 <br /> Total construction budget $ 23780 <br /> � <br /> � <br /> �. <br /> I <br />