Laserfiche WebLink
�Xffi�iT „�„ ,� <br /> '�enant Space D2 (1,400 SF) <br /> Zephyr Commons, Bldg D <br /> 7864 Gall Blvd <br /> Zephyrhills, FL <br /> Exhibit A: Scope of work for tenant build out {hereafter referred to as"scope"): <br /> I <br /> Architectural <br /> 1. The scope is limited to tenant space D2 in Bldg D. The northern tenant demising wall is an existing 1 � <br /> hour rated framed wall centered on grid line D2. The southern tenant demising wall is an existing 1 hour <br /> rated framed wall centered on grid line D3. The space shall be 20' x 70' (measured to outside faces of ', <br /> earterior walls and centers of demising walls). i <br /> 2. The scope does not include any work related to the parking lot, landscaping, site utilities, site drainage, <br /> site lighting, ar any other site features. <br /> 3. The scope does not include any work on any of the buildings in the shopping center other than Bldg D. <br /> 4. The scope does not include any work to the sidewalks, hardscape areas, or landscape areas immediately <br /> adjacent to any of the buildings. <br /> 5. The scope does not include any work to the finishes, awnings, stone work, or decorative trim on the <br /> exterior elevations of any of the buildings. <br /> 6. The scope does not include any wark to the storefront systems, decorative windows, front storefront <br /> doors, or rear hollow metal doors on any of the buildings. I <br /> 7. The scope does not include any work on the existing roof system other than what is required to add an <br /> exhaust fan and a vent for the new restroom. The scope does not include any work on the shingle roofs or <br /> on the roof drainage systems. <br /> 8. T'he scope does not include any work on the front framed wall. The e�sting 1 hour fire rating on the front <br /> framed wall shall be maintained. i <br /> 9. The scope does not include any work on the existing tenant demising walls other than what is required to <br /> install the new restroom. The existing 1 hour fire ratings shatl be maintained. <br /> 10. The scope includes adding 1/2" gyp board sheathing over 1.5" metal furring and 1.5" rigid insulation on <br /> the inside of the rear masonry wall inside the restroom only. All sheathing, furring, and insulation shall I <br /> terminate 10'-6" AFF. The sheathing shall be moisture resistant gyp board and shall receive enamel <br /> paint. The rest of the rear wall will be left as exposed masonry with no finish. <br /> 11. The scope includes providing a new fire extinguisher as required by code. <br /> 12. The scope includes installing a new restroom as shown on the attached exhibit B. <br /> 13. The restroom waIl behind the toilet shall be 6" metal stud framing with R19 batten insulation. The other ; <br /> restroom wall shall be 3-5/8" metal stud framing with Rl l batten insulation. Both walls shall have 1/2" <br /> paint ready gyp board sheathing on the exterior side. Both walls shall have 1/2" moisture resistant gyp <br /> board sheathing with enamel paint on the interior side. All framing, sheathing, and insulation shall <br /> terminate 10'-6" AFF. The restroom shall have VCT flooring and 6" high vinyl base on the inside of all <br /> walls. The owner shall be responsible for selecting paint, VCT, and vinyl base colors. <br /> I <br /> I <br />