Laserfiche WebLink
i <br /> , 14. The restroom shall have a pre-hung, hollow core wood door with a reinforced panel to accept a closer and <br /> a solid wood frame. The door shall be 1-3/4" x 36" x 80". The exterior of the door shall be left paint , <br /> ready. T'he interior of the door shall receive enamel paint to match the restroom walls. The hardwaze set i <br /> shall include 3 hinges, 3 silencers, 1 wall stop, 1 automatic closer, and 1"Schlage Privacy Lock" lockset. <br /> The door shall also receive ADA accessible signage as required by code. <br /> 15. The restroom accessories shall include 1 toilet paper dispenser, 1 paper towel dispenser, 1 soap dispenser, j <br /> 1 mirror, and 2 grab bars as required by code. All accessories sha11 be ADA compliant and shall be <br /> stainless steel. The contractor shall be responsible for locating any blocking required for the installation � <br /> of restroom accessories. � <br /> 16. The scope includes new 2' x 4' ACT ceilings at 10'-0" AFF in every room of the space. The ceilings will <br /> not have insulation. <br /> Structural <br /> 17. The scope does not include any work on the foundations, columns, beams, joists, roof deck, or trusses. � <br /> The scope does not include any structural work on the existing masonry or framed walls. ! <br /> 18. The scope includes saw-cutting the existing floor slab as needed to provide new plumbing. <br /> . e scope u1c u es re-pouring any portion of the existing slab that is saw-cut. It also includes pouring a � <br /> new slab in the area of the existing slab leave out at the rear of space D2. � <br /> i <br /> 20. All new slab pours shall be 4" thick 3,000 psi concrete. The top of all new slab pours shall be flush with <br /> the top of the existing slab. ' <br /> Fire Protection � <br /> 21. The existing building has a fire sprinkler system with the heads turned up. The landlord's tenant build out <br /> contractor will turn down the sprinkler heads and reposition them as needed to fit the ceiling layout. The <br /> design of the sprinkler system will be handled by the contractor through their signed and sealed shop <br /> drawings. The contractor shall be responsible for determining the exact locations of all sprinkler heads <br /> and for coordinating with all other disciplines. The contractor shall be responsible for providing signed <br /> and sealed shop drawings as required for permitting. <br /> 22. C&P's scope will not include review of the shop drawings for code compliance or constructability. <br /> Plumbing <br /> 23. The scope does not include any work to any underground sanitary lines other than what is required for <br /> connection of new sanitary lines. The scope does not include any work to any existing clean outs. <br /> 24. The scope includes removal of any unused portion of existing above ground stub-ins for space D2. <br /> 25. The scope includes connection of a new 4" sanitary line to the existing line. The new line shall be <br /> extended as needed to serve the new restroom. The sizes and locations of all sanitary branch lines and <br /> wall cleanouts shall be as required by code. , <br /> 26. The scope does not include any floor drains. The scope does not include any stub outs for future tenant � <br /> connection to the sanitary system. ' <br /> 27. The scope includes new vent piping and a new vent through the roof. The exact locations and sizes of the I <br /> vent pipes shall be as required by code. The scope does not include any stub outs for future connection to <br /> the vent pipes by the tenant. <br /> � <br />