Laserfiche WebLink
i <br /> � <br /> I <br /> , 28. The scope does not include any work to the water meter, the cold water main, ar any of the valves. The I � <br /> scope does not include any work to the cold water branch line other than what is required for connection <br /> of new cold water piping. <br /> 29. The scope includes connection of a new 1" cold water line to the existing branch line. The new line shall � <br /> be extended as needed to serve the new restroom. The sizes and locations of all cold water lines shall be ; <br /> as required by code. � <br /> 30. The scope does not include any hot water heater or any stub outs for future tenant connection to the cold ? <br /> water system. <br /> 31. The scope includes plumbing fixtures as required by code for a single uni-sex restroom in a mercantile <br /> occupancy. The fixtures shall include 1 tank type toilet, lwall hung sink, and 1"hi-low" drinking i <br /> fountain. All plumbing fixtures shall meet the requirements of the Florida Accessibility code. The ! <br /> contractor shall be responsible for locating any blocking required for the installation of the fixtures. <br /> 32. The scope does not include any work related to grease or gas. <br /> Mechanical � <br /> 33. The scope does not include any work to the e�usting 5 ton RTLJ above space D2 other than what is <br /> required to connect new HVAC ducting. The scope does not include wark for any other RTUs. <br /> 34. The scope does not include any work to any of the existing condensate lines. <br /> 35. The scope includes providing a full HVAC system based on typical dry goods retail use. The existing 5 <br /> ton RTU will not be upsized. No additional HVAC will be added. The locations and sizes of the supply <br /> diffusers, return grilles, and all ducting shall be as shown on the attached exhibit C. <br /> 36. The scope includes providing energ,y calculations as required by code. <br /> 37. The Bldg D shell drawings were designed and permitted under an older version of the Building Code. <br /> The space D2 tenant improvement drawings will be designed and permitted under the current version of <br /> the Building Code. The current code includes several changes to the requirements of energy efficiency. <br /> The scope does not include any changes to the existing insulation, glazing type, ar building envelope that I <br /> might be required if space D2 fails to meet the new requirements. <br /> I <br /> 38. The scope includes providing an exhaust fan in the restroom. The e�aust fan shall be sized as required �i <br /> by code and it shall be vented to the roof. <br /> Electrical <br /> 39. The scope does not include any work to the building transformer, the secondary conduit, the secondary <br /> wire, the main disconnect, the wireway, the tenant meter, or the tenant disconnect. <br /> 40. The scope includes sizing new wire to be pulled from the existing tenant disconnect to the new tenant I <br /> panel via the existing empty conduit. � <br /> 41. The scope includes providing a new tenant panel on the rear wall ne�ct to the restroom. The new panel � <br /> shall be 200 amp, 120 / 208 volt, 3 phase, and 42 pole. <br /> I <br /> 42. The scope includes several new power receptacles. These include 1 GFI receptacle in the restroom, 1 i <br /> dedicated receptacle for the drinking fountain, 2 ceiling mounted receptacles above the storefront i <br /> window, and convenience receptacles along both side walls at 20'-0" on center max. All new receptacles <br /> shall be wired to the new tenant panel. <br /> � <br />