Laserfiche WebLink
, 43, T�e scope does not include any changes to the existing sign junction box on the front of the building over <br /> the storefront. The scope does include wiring this junction box to the new tenant panel. i <br /> 44. The scope includes wiring the e�sting RTiJ, the new restroom exhaust fan, and all other components of ! <br /> the HVAC system to the new tenant panel. <br /> 45. The scope does not include any changes to the decarative sconce light fixtures on the front of the <br /> building. These fixtures will remain wired to the house panel. <br /> 46. 1'he scope does not include any changes to the e�sting wall mounted light fixture on the rear of the I <br /> building. The scope does include wiring this light fixture to the new tenant panel via a light switch. ', <br /> 47. The scope includes providing eaut and emergency light fixtures as shown on the attached exhibit C. <br /> These lights shall be wired to the new tenant panel. ; <br /> 48. The scope includes providing ceiling mounted 2' x 4' light fixtures as shown on the attached exhibit C. <br /> These lights shall be wired to the tenant panel and controlled by switches next to the rear door. <br /> 49. The scope does not include any changes to the e�usting telephone system. The existing conduit stubbed <br /> into the rear of the space shall remain as is. <br /> Fire Alarm <br /> 50. The existing building has a fire alarm system. The landlord's tenant build out contractor will modify the <br /> system as needed to provide a code compliant fire alarm system in space D2. The landlord's tenant build <br /> out contractor will also modify the rest of the existing fire alarm system as needed to ensure that it still <br /> meets the requirements of the local jurisdiction after the build out for space D2 is complete. The design i <br /> of the alarm system will be handled by the contractor through their signed and sealed shop drawings. The <br /> contractor shall be responsible for determining the exact locations of all fire alann components and for <br /> coordinating with all other disciplines. The contractor shall be responsible for providing signed and <br /> sealed shop drawings as required for permitting. <br /> S I. Cuhaci & Peterson's scope as it relates to the fire alarm system shall be limited to schematic design. <br /> C&P will provide construction drawings showing schematic locations of fire alarm equipment only, <br /> C&P's scope will not include review of the shop drawings for code compliance or constructability. I <br /> Permit, Bid & Construction <br /> 52. The scope includes providing signed and sealed drawings as required for permits and responding to all <br /> permit comments. The scope does not include submitting drawings or meeting with local jurisdictions. <br /> 53. The scope includes responding to contractor questions. The scope does not include preparation of bid <br /> instructions, review of bids, or review of proposed alternate materials. <br /> 54. If required for project close out, the scope includes preparation of an ArchitecYs Certificate of Substantial <br /> Completion (AIA document G704). The scope does not include site visits, review of submittals, review <br /> of change orders, or review of payment applications. � <br /> � <br /> � <br />