Laserfiche WebLink
CARLI'SLE'S <br /> ,, <br /> �I�RE-WELD� <br /> GUIDE-SPEC <br /> Sure-Weld� TPO MECHANICALLY-FASTENED ROOFING SYSTEM <br /> February 2006 <br /> This GUIDE-SPEC is a brief outline of Carlisle's Sure- 3. Projects with fasteners specified to exceed 12" <br /> Weld Mechanically-Fastened Roofing System requirements and is <br /> intended for use as a submittal with a bid package. Specifiers and 4. Air pressurized buildings, canopies and buildings with <br /> the Carlisle Authorized Roofmg Applicator must comply with the lazge openings where the total wall opening exceeds <br /> "Design Criteria" and "Application" sections of Carlisle's 10% of the total wall area where openings are located. <br /> Specifications prior to design or bid. <br /> 5. Cold storage buildings and freezer facilities. <br /> PARTI GENERAL <br /> 1.O1 DESCRIPTION 6. Projects where the membrane is expected to come in <br /> direct contact with petroleum-based products or other <br /> The Sure-Weld Mechanicaily-Fastened Roofing System chemicals. <br /> incorporates 12', l0' or 8' wide, white, gray or tan 45, 60, 72 or 80- <br /> mil thick scrim-reinforced Sure-Weld Thermoplastic Polyolefin B. Along with the project submittals (shop drawings and <br /> (TPO) membrane. Insulation is mechanically fastened to an Request for Wamanty}, the roofing contractor must include <br /> acceptable roof deck. Sure-Weld perimeter sheets (6', 5' or 4' wide pullout tests when: <br /> respectively) aze installed along the building edges and field <br /> membrane sheets aze mechanically fastecied to the roof deck with 1 HP-X Fasteners are used through a lightweight <br /> the appropriate Carlisle Fasteners and Fastening Plates. Adjoining insulating concrete substrate into a steel deck lighter <br /> sheets of Sure-Weld membrane are overlapped and joined together than 22 gauge. <br /> with a minimum 1-1/2" wide hot air weld. Refer to the "Design <br /> Criteria" section for the required number of perimeter membrane 2. HP-X Fasteners are used in conjunction with plywood <br /> sheets and the required fastener spacing. decks less than 5/8" thick or oriented strand board <br /> (OSB) minimum 7/16" thick. <br /> 1.02 QUALI7'Y ASStiRANCE <br /> 4 HP-NT'B Fasteners are used in conjunction with <br /> A. This roofing system must be installed by a Carlisle cementitious wood fiber and gypsum decks. <br /> Authorized Roofing Applicator in compliance with shop <br /> drawings as approved by Carlisle. There must be no C. For all projects (prior to project inspection by Cazlisle) a final <br /> deviations made without the PWOR WRITTEN shop drawing must be approved by Carlisle. <br /> APPROVAL of Carlisle. <br /> 1.04 PRODUCT DELIVERY, STORAGE AND <br /> B. Upon completion of the installation, an inspection will be HANDLING <br /> conducted by a Field Service Representative of Carlisle to <br /> ascertain that the membrane roofing system has been installed A. Deliver materials to ihe job site in the original, unopened <br /> according to Carlisle's published specifications and details containers labeled with the manufacturer's name, brand name <br /> applicable at the time of bid. and installation instructions. <br /> C. This roofing system meets Uederwriters Laboratories (iJL) B. Store Sure-Weld membrane in the original undistutfied plastic <br /> and Factory Mutual (FM) requirements. For specific code �p• <br /> approvals achieved with this roofing system, refer to the <br /> Sure-Weld Code Approval Guide, Factory Mutual Approval G Job site storage temperatures in excess of 90° F inay affect <br /> Guide or Underwriters Fire Resistance and Roofing Materials shelf life of curable maierials (i.e., adhesives and sealants). <br /> and Systems Directories. <br /> D. When liquid adhesives and sealants are e�cposed to lower <br /> 1.03 SUBMITTALS temperatures, restore to a minimum of 60° Fahrenheit before <br /> use. <br /> A. To ensure compliance with Carlisle's watranry requirements, <br /> the following projects should be forwarded to Carlisle for E. Do not store adhesive containers with opened lids due to the <br /> review prior to installaUon, preferably prior to bid. loss of solvent, which will occur from flash off. <br /> 1. Projects where a wind speed wamanty coverage greater F. Insulation and underiay- �� <br /> than 55 MI'H peak gusts is specified. ment must be stored so it is <br /> kept dry and is protected <br /> 2. Projects where the building height exceeds 50' from the elements. Store Caritsle SraTec Ine�poreted <br /> 600319 � <br /> SWMF Guide - 2/2006 <br />