Laserfiche WebLink
J <br /> �1 S��d i.�.�V <br /> 6.4 StormGuardO: <br /> 6.4.1 StormGuard� shall be installed in compliance with the requirements for ASTM D1970 <br /> underlayment in FBC Sections 1507 for the type of prepared roof covering t:o be installed <br /> 6.4.2 For tile roof installations governed by the FRSA/TRI 07320/8-05 Installation Manual, Fourth <br /> Edition, use is limited to. <br /> ➢ System 1, Option 5 or 6, Section 3.02E or F <br /> � System Z, Option 4 or 5, Section 3.02D or E <br /> 6 4 3 Back-nailing is required Back-nailing shall consist of minimum 1-inch square or round cap <br /> nails spaced 18" o.c. within 3-inch side laps <br /> 6.4.4 Prior to removal of release film, align sheets properly starting at the low-point af the roof <br /> (eave) with the selvage edge upslope and for minimum 2-inch overhang at eaves and rakes <br /> Remove the lower piece of release film and bond to substrate and fold the overhanging 2-inch <br /> over the eave and nail into place 12" o.c. Remove the top piece of release film and bond to <br /> substrate. Install primed drip edge and fasten to meet FBC Chapter 16 wind load <br /> requirements Install 1/8-inch troweling of LeakBusterT"' MatrixT"' 201 Premium SBS Flashing <br /> Cement over drip edge. <br /> 6 4.5 Continue upslope in a similar manner, maintaining minimum 3-inch side-laps and minimum 6- <br /> inch end-laps. Ensure all end laps are staggered at least 18-inch apart. <br /> 6 4.6 Use a hand roller to firmly bond side and end laps. <br /> 6.5 StormGuardO Ultra-FIexT"': <br /> 6.5.1 StormGuard� shall be installed in compliance with the requirement.s for ASTM D1970 <br /> underlayment in FBC Sections 1507 for the type of prepared roof covering to be installed <br /> 6.5.2 For tile roof installations governed by the FRSA/TRI 07320/8-05 Installation Manual, Fourth <br /> Edition, use is limited to: <br /> � System 1, Option 5 or 6, Section 3.02E or F <br /> > System 2, Option 4 or 5, Section 3.02D or E <br /> 6 S 3 For direct-bond to deck applications where the material is not covered within 24 hours, <br /> plywood shall be primed with LeakBuster'"' MatrixT'" 307 Premium Asphalt Primer or alternate <br /> GAF-ELK accepted ASTM D41 primer at'/z to 3 /a gallon per 100 square <br /> 6.5.4 Back-nailing is required Back-nailing shall consist of minimum 1-inch square or round cap <br /> nails spaced 18" o.c. within 3-inch side laps. <br /> 6 5 5 Prior to removal of release film, align sheets properiy starting at the low-point of the roof <br /> (eave) with the selvage edge upslope and for minimum 2-inch overhang at eaves and rakes <br /> Roll out approximately 10 feet of inembrane and peel back the first 3 feet of release film <br /> Adhere the exposed part to the substrate and unroll the remaining mernbrane Peel off the <br /> release film diagonally while holding the membrane tight. <br /> 6 5 6 Fold the overhanging 2-inch over the eave and naii into p�ace 12" o c Rernove the top piece of <br /> release film and bond to substrate Install primed drip edge and fasten to meet FBC Chapter <br /> 16 wind load requirements Install 1/8-inch troweling of LeakBusterT'" Niatrix'"' 201 Premium <br /> SBS Flashing Cement over drip edge <br /> 6 5.7 Continue upslope in a similar manner, maintaining minimum 3-inch side-laps and minimum 6- <br /> inch end-laps. Ensure all end laps are staggered at least 18-inch apart. <br /> 6 S 8 Use a hand roller to firmly bond side and end laps <br /> Exterior Research and Design, LLC. Evaluation Report 01506.04.08 <br /> Certificate ofAuthorization #9503 FL10626 <br /> Date of Issuance: 04/25/2008 <br /> Page 5 of 9 <br />