My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12514
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 2:58:39 PM
Creation date
6/18/2012 2:58:31 PM
Metadata
Fields
Template:
Building Department
Company Name
HR BLOCK
Building Department - Doc Type
Permit
Permit #
11-12514
Building Department - Name
SF ZEPHYR COMMONS LP
Address
7860 7856 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , � <br /> Electrical <br /> 43. The scope includes providing a new 200 amp electrical service for tenant space D3. The scope does not <br /> include any work to the existing 200 amp electrical service for space D4, other than what is required to <br /> � disconnect certain items from the D4 tenant panel and reconnect them to the D3 tenant panel. The scope <br /> does not include any changes to the existing main electrical service for the building, other than what is <br /> required to provide the new electrical service for space D3 <br /> 44. The scope does not include verifying that the existing main electrical service has the capacity to serve this <br /> tenant. The scope does not include being aware of any changes other tenants have made that could affect <br /> the capacity of the existing main service. <br /> 45. The new tenant panel for space D3 shall be 200 amp,120 / 208 volt, 3 phase, and 42 pole. The panel will <br /> be in the location shown on the attached exhibit. <br /> 46. In space D4, the existing components of the electrical system (outlets, sign junction box, HVAC <br /> equipment, and light fixtures) shall remain as is. In space D3, the existing components of the electrical <br /> system shall be disconnected from panel D4 and rewired to panel D3. <br /> � 47 The scope will include new power receptacles as shown on the attached exhibit. " �8T /F <br /> T Ti�/�E'D <br /> 48. The scope does not include any changes to any of the existing exterior lights. <br /> 49. The scope includes shifting the existing interior lights as needed to accommodate the new interior wall <br /> layout. <br /> 50. Exit and emergency light 8xtures will be added as required by code. No other lights shall be added. <br /> 51. In space D4, the existing components of the telephone and data systems shall remain as is. New <br /> telephone and data outlets will be added as shown on the attached exhibit. In space D3, the existing <br /> components of the telephone and data systems shall be disconnected from the D4 system. The conduit <br /> and cable for these components shall be stubbed up above the ceiling for future tenant use. The scope <br /> does not include a new telephone terminal board for space D3. <br /> Permit, Bid & Construction <br /> 52. The scope includes providing signed and sealed drawings as required for a permit for new interior <br /> construction. The scope includes responding to all permit comments. The scope does not include <br /> submitting drawings or meeting with local jurisdictions. <br /> 53. The scope includes responding to contractor's requests for clarifications. The scope does not include <br /> preparation of bid instructions, review of bids, or review of proposed alternate materials. <br /> 54. If required for project close out, the scope includes preparation of an Architect's Certificate of Substantial <br /> Completion (AIA document G704). The scope does not include site visits, review of submittals, review <br /> of change orders, or review of payment applications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.