Laserfiche WebLink
� i i 'I� <br /> � <br /> Plumbing <br /> 30. The scope does not include any �h�l�es in space D4. The s ope 'mc udes�add h g a new restroom in <br /> include adding any new plumbing e toilet, lwall hung sink, and 1"hi low" drinking I <br /> space D3. The new restroom shall include 1 tanlc typ <br /> fountain. All plumbing fixhu'es shall meet the requiremenes� d for the installation the fixtures. <br /> contractor shall be responsible for locating any <br /> blocking Q <br /> 31. The scope does not include any changes to the existing main �'ri W water lines as n o serve the new <br /> existing restrooms in space D4. The scope includes providing <br /> restroom in space D3. The new water lines �be sized as by codeg branch line stub-in above the <br /> ceiling in space D3. All new water lines shall <br /> 32. The scope does not include hot water or stub-ins for future tenant connection to the water system. <br /> 33. The scope does not include any changes to the existing main sanitary line or the branch line that serves <br /> the existing restrooms in space D4. The scope �l�e shall be ed as required by codeneeded to serve <br /> the new restroom in space D3. All new sanitary ' <br /> 34. Tke scope does not include floor drains or stub-ins for future tenant connection to the sanitary system. <br /> changes to the existing vent system serving the e�sting restrooms in <br /> 35. The scope does not include any roof and new vent piping as required to serve the new <br /> space D4. The scope includes a new vent through <br /> restroom in space D3. All new vent piping shall be sized as required by code. The vent through of the ill <br /> be Iocated directly above the new restroom. The scope does not include verifyinS tha proximity <br /> new vent to any other existing roof equipment or roof penetrations. <br /> 36. 'The scope does not include verifying the capacity of the existing plumbing systems. The scope does not <br /> include being aware of any changes other tenants have made that could affect the capacity of the existing <br /> plumbing systems. <br /> 37. The scope does not include any work related to gi'ease, gas, or storm. <br /> Mechanical <br /> 3g, The scope of work does not include any changes to the existing RTU's or condensate lines. The scope <br /> does not include verifying the proximity of the existing RTUs to any other existing roof equipment or <br /> roof penetrations. <br /> 39. The scope does not include any changes to the existing HVAC distribution system, other than what is <br /> required to accommodate the changes to the interior wall layout. <br /> restrooms in <br /> 40. The scope does not incl c u�an a new e t system for he new restroom in pace D3 The new exhaust <br /> space D4. The scope in <br /> vent on the roof shall be directly above the new restroom. The scope does not include verifying e <br /> pro�mity of the new e�►aust vent to any other existing roof equipment or roof penetrations. <br /> 41. The scope includes providing energy calculations as required by code. <br /> 42. The existing building was designed and permitted under an older version of the Building Code. These <br /> tenant improvement drawings will bV dal ch�an anao �� qu r ments for energy effic ency� The s ope <br /> Co de. T h e c u r r e n t c o d e i n c l u d e s s e �SUlation, glazing type, or b u i l d i n g e n v e l o p e t h a t m i g h t be <br /> does not include any changes to the e�sting <br /> required if the space fails to meet the ourrent requirements. <br />