My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-12625
Zephyrhills
>
Building Department
>
Permits
>
2011
>
11-12625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:16:00 PM
Creation date
6/20/2012 2:15:56 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR HEIGHTS
Building Department - Doc Type
Permit
Permit #
11-12625
Building Department - Name
CHENKIN FAMILY TRUST
Address
39050 MANOR DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MULE-HIDE PRODUCTS CO., INC. <br /> MECHANICALLY ATTACHED PVC SYSTEM SPECIFICATION <br /> 07520/MUL <br /> PART 1— GENERAL � <br /> 1.01 Description <br /> A. Scope: , <br /> 1. Furnish and instaU a Mechanically Attached Mule-Hide Reinforced PVC RoaFing <br /> Membrane with flashings and acc�ssories necessary to comprise a roofing <br /> system. <br /> B. Related Work: <br /> The work indudes, but is not necessarily limited to the installation of: <br /> 1. Vapor Retarder (where spec�edj <br /> 2. Wood Blocking (Nailers) <br /> 3. Insulation <br /> 4. Slip Sheet (where required) <br /> 5. Fasteners <br /> 6. Roof Membrane <br /> 7. Roof Membrane Flashings <br /> 8. Metal Flashings <br /> S. Adhesives <br /> 10. Sealants <br /> 11. Walk�►rays <br /> 1.02 Quality Assurance <br /> A. The Mule-Hide Reir�forced PVC Membrane Roofing System shall be installed by an <br /> independer�t roafing oontrador eligible to apply for Mul�Hide warranties when Standafd <br /> System and Premium System Wamanties are requested. <br /> B. There shall be no deviations from this specification or the Mu1�Hide Products Co. ("Mule- <br /> Hide") standard details without prior written approval from Mul�Hide's Customer Service <br /> Department. <br /> C. Upon completion of the instaliation acc;ording to the tertns and conditions stated in this <br /> specification and in accordance with the ir�formation provided in the Warranty Application <br /> and Pr�Job sunrey form and any additional approvals which might have been given by <br /> Mule-Hide, an authorized representative aF Mule-Hide may pertorm an on-site inspection <br /> of the roo�f to verify that all installation and material requirements have been met. <br /> i.03 Submittals <br /> A. Prior to the time of bidding, the roaflng contradw shall submit to the Owner or Owner's <br /> representative the following items: � <br /> 1. Copies of Mule-Hide's specific�tion and published product data. <br /> 2. Samples of each material to be used in the roof system. <br /> 3. Specimen copy of Mule-Hide Products Co. warranty <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.