Laserfiche WebLink
4. Dimensioned shop drawings to include an ouUine af the ro� and appropriate <br /> details for flashings and terminations. <br /> 5. Certification from insulation, roafing and accessory cornpcments manufacturers <br /> that all materials supplied compfy with identified ASTM and industry standards. <br /> 6. Verification that system specifications meet atl identified code and insurance <br /> requirements induding but not limited to the following: <br /> a. Faetory Mutual Researoch Laboratories <br /> Non+vood, MA <br /> b. Underwriters Laboratories <br /> Northbrook, IL <br /> 7.04 Product Delivery, Storage and Handling <br /> A. All produds delivered to thejob site shall be in their original unapened containars or <br /> wrappings and clearly labeled with the manufadurer's name, product identification and <br /> date af' manufacture. <br /> B. Protect all materials from damage during transit, storage and delivery to the job site. <br /> Place all materials on pallets and protect from masture. <br /> C. Store all materials in a dry, dean area proteded from the elemerrts. All ydls of inembrane <br /> shall be stored flat on p�lets. <br /> D. All adhesive and caulking shall be stored at temperatunes between 60 `F and 80`F. <br /> E. All flammable materials shall be stored in a cool, dry area away from open flames and <br /> sparks. Follow precautions outlined on containers or supplied by the material <br /> manufadurer/supplier. <br /> F. All materials determined to have been damaged (confirmed by Mule-Hide) are to be <br /> replaced with new materials at no cost to the owner. <br /> 1.05 Job Conditions <br /> A. Mule-Hide PVC roofing materials may be ir�stalled under certain adverse wieather <br /> c�nditions such as high humidity or extreme temperatures, but only after consultation <br /> with the Mule-Hide Customer Service Department as special precautions or procedures <br /> may be necessary. The performanoe of the materials, installation costs and production <br /> rates may be affeded. <br /> B. Only as much new roofing as can be made watertight each day shall be installed each <br /> day. This includes all flashing work <br /> C. All substrates to receive new insulation, membrane orflashing shall be thoroughly dry <br /> and free of �ntaminants. Should surfacg masture occur, the contractor should pravide <br /> adequate equipment to dry the substrate prior to the application af new materials. <br /> � <br /> D. Prior to and during application, all dirt, debris and dust shall be removed from surfaces to <br /> be roofed for both new and reroofing substrates. <br /> E. On all reroof jobs and for all lightweight dedc systems, pullout tests shall be performed by <br /> the independent r�ng contractor, fastener manufacturer or owner's representative to <br /> verify the condition of the deck or substrate and to confi►m system design pullout values. <br /> 2 <br />