Laserfiche WebLink
/ <br /> Revised March 5.2009 <br /> Florida <br /> Recommended Window Installation Instructions <br /> For Metal, Vinyl, Flush Mount and Recessed Fin <br /> Including Egress Units <br /> MANUFACTURERS NOTE:Failure to follow these instructions may cause the window not to function properly. <br /> All product liability and warranty could be void. These installation instructions are recommendations only. <br /> Local building codes may impose additional requirements,and those codes may supersede these instructions. <br /> I. Rough Opening Preparation <br /> A. Opening for windows should be framed in accordance with the required standards for size of <br /> window used in order not to apply any loading to the window which may hamper its operation. <br /> The prepared rough opening should allow 1/8"clearance on each side,the head and the sill, <br /> including the thickness of pre-finished paneling,shims,liners,etc.,where used. <br /> B. Window rough openin�should be level.plumb and sQuare: Check width,height,and diagonal <br /> measurements for squareness. There should be no more than 1/8"variation between these <br /> measurements. Avoid the use of warped,twisted,or knotted framing members. It is <br /> recommended that the sill of the rough opening be straight and level. Bowed or warped sill <br /> framing members can result in a crowned sill of the window. <br /> C. Make certain all mounting surfaces (siding included)are securely fastened and flat around the <br /> perimeter of the window opening. Check the opening for correct size. Kinro recommends adding <br /> 1/4"to the actual window width and 1/4"to the actual window height for th�rough opening size. <br /> D. According to Federal Manufactured Home Construction and Safety Standard,the bottom of an <br /> Egress window shall not exceed 36 inches above the floor,nor shall any latch or other device for <br /> the window,screen,or storm window which needs to be operated in order to permit exiting,be <br /> located in excess of 54 inches from the finished floor. <br /> E. Fj�jgg: It is not the responsibility of the window manufacturer to design or recommend a <br /> flashing system appropriate to each job condition. <br /> II. Window Installation <br /> A. It is recommended to apply a 1/8"thick,suitable,good quality,non-hardening,water resistant <br /> sealant tape (putty or butyl type)to the back of the window mounting flanges in order to provide <br /> a good seal with the homes weather-proof envelope. If a gunable sealant is used,a 1/4"bead <br /> should be applied centered over the mounting holes on the back of the window mounting flange. <br /> CAUTION: <br /> • For vinyl windows,do not use a sealant that contains solvents which may chemically <br /> attack vinyl. <br /> • The use of foam tapes is not recommended for window installation. <br /> B. Do not remove any shipping clips (if provided on the window series being installed)and alwavs <br /> kee,� e��sash closed and locked during installation. <br /> Page 1 of 4 <br />