My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-12729
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-12729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2013 1:06:28 PM
Creation date
1/25/2013 1:06:24 PM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
12-12729
Building Department - Name
NHC-FL 115 LLC LOT 82
Address
3916 QUAKER RIDGE ST LOT 82
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Always handle windows properly. Always pick them up by both side jambs using both hands. <br /> � Never pick up and handle windows by the header only,sill only,or by one side jamb only. This <br /> can damage the windows and possibly rupture the glazing seal and/or joint c:aulking,thus <br /> resulting in a possible leak. <br /> D. Carefully insert the window into the opening. Center the window in the rough opening with the <br /> sill of the window resting on the sill of the rough opening. <br /> E. Drive the first fastener at approximately the center of the vertical frame jamb. Drive the second <br /> fastener on the opposite jamb at the approximate center. Drive the third fastener at the center of <br /> the sill member. (Note:When installing windows check the window sill for straighrness. If <br /> the window sill is crowned,apply light pressure at the center of window sill until it is level. <br /> 1Nhile holding the sill level,drive the third fastener into the center of the sill.) Drive the <br /> fourth fastener at the center of the head. Run fasteners,from one of the above fasteners,to the <br /> end of each frame member). Repeat this step until all fasteners have been inserted from the <br /> center of the vertical frame jamb outward to both ends of each member. Finish installing the <br /> fasteners from the center of the Frame Head and Sill outward to the ends of each member. See <br /> attached drawing for visual guide to fastener placement of assorted window types. <br /> Note: All fasteners should be driven straight into the window frame. See section III for <br /> fastener information. <br /> This sequence of fastener installation applies to both vertical and horizontal sliding windows, <br /> flush mount and recessed fin mount,for both metal and vinyl windows. A drawing is attached <br /> for visual reference. <br /> After the initial fasteners are placed,it is important that the installer does not run the remainder <br /> of the fasteners in a continuous clockwise(or counter clockwise)fashion around the window. <br /> F. Avoid damage to the seal between the glass and the window glazing member. Power drivers <br /> should be adjusted so as not to cause excessive dimpling of the window flanges. Careless <br /> mounting procedures could negate window certification. <br /> G. If the exposed surfaces of the rough inside opening are to be trimmed out with pre-finished <br /> paneling,it must be done in such a manner so as not to distort or twist the window frame <br /> members and make the operating sash tight or inoperable. If interior trim is installed prior to <br /> window installation insure that enough room is left to allow the window to fully seat against the <br /> exterior wall surface. Do not obstruct tilting sash operation or locking mechanisms with inside <br /> trim,wood molding,etc. <br /> H. Windows should be checked after installation to make sure that all moving panels,mechanisms, <br /> latches,and other hardware function properly. Any shipping clips must be removed prior to <br /> operation of the window.All windows should be checked for out-of-square o r bowing of frame <br /> members. If any of the above problems are present,window should be removed and re-installed <br /> properly.Double hung windows require extra care during installation.Double hung <br /> windows do not have fixed glass,which offers additional frame stability. <br /> I. The window's exterior mounting flanges should be checked after the installation to assure an all- <br /> weather seal. It is recommended to seal the outside top of window(full width)with a good quality <br /> sealant for additional insurance. <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.