My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13309
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13309
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2013 2:21:32 PM
Creation date
6/28/2013 2:21:31 PM
Metadata
Fields
Template:
Building Department
Company Name
BOLENDER INVESTMENTS INC
Building Department - Doc Type
Permit
Permit #
12-13309
Building Department - Name
BOLENDER INVESTMENTS INC
Address
39240 SOUTH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARINO/WARE,DIV OF WARE INDUSTRIES INC—Viper20TM Track VT100. <br /> . • 2.Steei Studs—Min 2-1/2 in.deep,fortned of min 25 MSG gaN steel max stud spacing 24 in.OC.Studs to be cut 3/4 in. <br /> less than assembly height. <br /> 2A.Framirq Members•—Sbeel Studs—As an altemate to Item 2-For use with Item SA,channel shaped studs,min <br /> 2-1/2 in.deep,spaced a max of 24 in.OC.Studs to be cut 3/4 in.less than assembly height. <br /> ALLSTEEL�GYPSUM PRODUCT'S INC—Type SUPREME Framing System <br /> CALIFORNU EXPANDED METAL PRODUCTS CO—Viper20TM' <br /> CONSOLIDATED FABRICATORS CORP,BUILDING PRODUCTS DIV—Type SUPREME Framing System <br /> MARINO/WARE�DIV OF WARE INDUSTRIES INC—VIp2�20TM <br /> PHILLIPS MFG CO L L C—Viper20TM' <br /> TELLING INDUSTRIES L L C—Viper20TM <br /> QUAIL RUN BUILDING MA7'ERIALS INC—Type SUPREME Framing System <br /> SCAFCO S7EEL STUD MANUFACTIlRING CO—Type SUPREME F2ming System <br /> STEEL CONSTRUCTION SYSTEMS INC—Type SUPREME Framing System <br /> UNITED METAL PRODUCTS INC—Type SUPREME Framing System <br /> 2B.Sbael Studs—(AS an altemate to Rem 2,For use wRh Rem 4D)Channel shaped,fabricated from m�20 MSG <br /> corrosion-protected or gaN steel,3-1/2 in.min depth,spaced a max of 16 in.OC.Studs fiiction-fit into fbor and ceiling <br /> runners.Studs to be cut 5/8 to 3/4 in.less than assemby height. <br /> 2C.Framinp Members*—Sbeel Studc—As an aRemate to�em 2-For use with Item 18,channel shaped studs,min <br /> 2-1/2 in.wide fabricated from min 0.015 in.thick gaN steel,spaced a max of 24 in.OC.Studs to be cut 3/4 in,less than <br /> assembly height. <br /> CLARKDIETRICH BUILDING SYSTEMS—CD ProSTUD <br /> DMFCNBS L L C—ProSTUD <br /> MBA BUILDING SUPPLIES—ProSTUD <br /> SOUTHEASTERN STUD�COMPONENT'S INC—ProSTUD <br /> STEEL STRUCTURAL SYSTEMS L L C—Tri-S ProSTUD <br /> 2D.Framinp Membara*—Sbael Stu�—As an akemate to Aem 2-For use with ftem 1D,channel shaped studs,min <br /> 2-1/2 in.wide Fabricated from min 0.018 in.thick gaN steel,spaced a max of 24 in.OC.Studs to be cut 3/4 in.less than <br /> assemby heght. <br /> TELLING INDUSTRIES L L C—TRUE-STUDTM <br /> 3 of 7 7/25/2012 2:52 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.