Laserfiche WebLink
1 � <br /> ; <br /> ROUGH OPENING PREPARATION ' � <br /> � SETTING A <br /> A. Verity the opening is plumb,level and square. Ensure ��ot ; A Install aill spacer. <br /> the bottom of t�e rough opening does not slope towud ' the bottom of the <br /> �e��or ; cut 1/2"s�orter t� <br /> Not�Db not/rsstall in orrt-of- aa�r o lA <br /> s9 P�ni�or an a � �cenured becween i <br /> s��rfac�e that�s not Jev�el. ; shim betvv�xn the <br /> ' the rough opening <br /> , <br /> ' NotG To dedumL <br /> � <br /> B Verify the wiudow wll18t the openiag.Mea�ure all ' distaoae 6»m� <br /> four sides of the opening to m�lce sune it ia 1/2"lacgu ' �d aut the spaa <br /> chan che window in both vvidth and height.On a � ��01°�m°� <br /> openings measure che width and height in scwenl�aces ' boltam ofd�e wic <br /> to ens�u+e the hqder or s;uds at+e not bowed. � � <br /> No�Ge:I-1/2"ormarc ofaalid wnodblocbi���s�rqu�/ ` � B. Remove plastic Nn <br /> arormd tbe p�sr�meter af the openir�Fiz aay pf»�blr.ms � DO NOT open tt <br /> w�th tbe.nugb apr.atigbJo„ep�uaed� ia E DO N T��istau� <br /> r <br /> � <br /> � I <br /> ' 2 OR MORE PEOPLE' <br /> C. Cut the weather iesBstive barrier(1C). <br /> v <br /> i <br /> `' ' C.L13E!'t[ilE W�RdOq <br /> � : �y}°j`'.'" ;, ' Plue the boaom o <br /> �.� 4di cuc : bottom of the o�t <br /> � 4. y;;;� Make a 6"cut up from ; Center the wtndovl <br /> "�' `' , s.,;�,, nch cop comu u a 4s° i allow cleuance for <br /> �.�.� <br /> - .Tn ���'-�'r' ;�; .�o�le co aUow du weufier in che&rsc hole fro <br /> -'�R� • !�'?ii' `+a w be lapped over � naili[�����a <br /> �`+.��`!PS�U� • ,�= a" �n at clu head of du w�!(e sfllnl � <br /> ,����' ��� +1" . .�OW. u 1 <br /> �i� `'�i� x�;, � Not�:DO N�f d� <br /> - - - --- <br /> +ic : <br /> � <br /> . <.._,Cd � .. S <br /> �� 1 <br /> � D.Plumb an � x <br /> �, e 1�FfOIII[�1G U�._.a)II <br /> D.Fold the w�eather res9stivie barrier(1 D).Fold side �`� � becvv�een�e winda <br /> and boaom s mto the opening and stapk to inside �d i ope�ng.Ad'ust th� <br /> wall.Fold to u uid aeta O '�., ; 1 <br /> P P P��Y fasren wich ln �� � plumb and squue i <br /> Auhing taPe- � o <br /> � , J <br /> �, � Ca�Eat and Fiao <br /> � � aoeeds 47",•plaa s <br /> � of the window udc <br /> -� .," , Double and Singlc <br /> � � APP1Y sW�ng tape#1.Cut a piooe of Auhing � � � <br /> tape 12"longa than t6e opuung width.Apply at che ` 47"�p l�dia n� <br /> bottom oF the opening as shown(1 E)w it averhuigs 1" � <br /> to the aterior. � the checkrail shicns <br /> "5 f bottom shicns. <br /> � Not�?]!�e tApie fa cut 12"lhqaer than the widtlr s+o that '" ; " <br /> it w�L erti�ad 6"up eacb alde afths open� �' lE a <br /> , <br /> .�'` , E. Fasten the window <br /> - F roofing nails into e� <br /> ; fin.Drive nails unri <br /> F. Tab the s111 tlashing hpe and fold.Cuc 1"wide rabs lp ; sink the head.'Iyis <br /> u each corner(1�2"ftom adi side of corner) (1 F).Fold Q DP 50:Insert#g z <br /> tzpe to the aterior and press firmly to adhere ic to che � with Aat washers im <br /> weatf�a resiative barrier. � Drive screws until c <br /> � <br /> � not sink the washer. <br /> . . � <br /> � <br /> :.�''�� ; <br /> G.Appty sill tla:hing tape#2,Cut a pieoe of flaahing cape ; E Check windaw ope <br /> 12"longer t�an tlx opening width.APPi3'u t6e boaom, 1G � window a kw dmes <br /> ping cape#1 by ac kaac 1".Do noc allow che cape co � ���, <br /> e=oen past the iaoaior fa,oe of che framing(1G). ' Doubk md Single <br /> Notc?L'e Bas6irq�tape d�t nat aeed to erGertd all tbe ' � Nate:If tLrsir ar�e a <br /> rv�,�to Glre�iil�r�lor af d6e�ramLq� -� ,,a � nacbedr s6rm lroratl <br /> � <br /> � <br /> : <br />