My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-13751
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-13751
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2013 1:56:57 PM
Creation date
9/13/2013 1:55:30 PM
Metadata
Fields
Template:
Building Department
Company Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
13-13751
Building Department - Name
FLORIDA HOSPITAL OF ZEPHYRHILLS
Address
7050 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l�v tast Higniana ur4ve <br /> Lake(and, �L 33813 <br /> �,�� � (P�one} 863-669-0990 <br /> ����g�������-'�� (Fax) 863-567-3778 <br /> GENERRL CIINiRACiQSS <br /> . LICENSE NO CGCD6T496 <br /> �������� ����� <br /> Proj�ct. F�f� EE� Fast T'rack Remod�t 3�.0. Na.: 376-'l2-15239-P <br /> ���at�rar�:7050 Ga1I Bivd pwraer: ��orida �lospital Zephryhills <br /> Zephyrhi�is, �L 335�1 �r�p�/��g: <br /> T�: Universai Cire Systems, lnc Pi�s�rae: 813-662-9200 <br /> 374 Nobbs Road Fax: 813-662-OQ8t7 <br /> Tampa, FL 33619 C(7�E: 15239-SPR�NKLER SYS/HOOD <br /> Rodcla Construction, Inc hereir�after cafled the"Cc�ntractor" and supplier agree as follows <br /> 1 DESGRIPTION OF THE WORK. Supplier agrees to furnish dll �raterial and/or aA labor as d�scribed in this paragraph <br /> for the above project as shown on the plans as listed on the attached Exhibit A and described in the specifications as <br /> prepared by the above Architect or Engineer Supplier acknowledges receipt of specificatior�s including Addendum O, <br /> incfusive, and Aiternat�s (} and cer#ifies that he has carefully examined same and is familiar with al! the requirements <br /> therein insofar as it affects the work to be done by such Supplier. <br /> 1a The Supplier fio the extent of the work to be per'formed by the Supplier is bound to the Contractor by the plans and <br /> specifications and assumes taward t�e Contrac?or ail khe obligations and responsibilities which the Cantractor, by these <br /> docume�tts, assumes foaFrard fihe Owner anti Eng�neer. The Materials to be furnished and/or uvork ta be doi�e by Supplier <br /> are as foilows� <br /> This contract is to include la�or, materiaks and equipment in order ta complete the fre sprinkler por�ion of tne project. <br /> It2ms to be incfud�d are engineered draw;ngs, concealed sprinkler heads an� relocation of any existing heads necessary <br /> far the r�ew layout. <br /> Contract Price �5,312.00 <br /> DO NOT PROCESS PENDING ARCHITECT'S APPROVAL. It1CIUd2S T8X 8C3d OeIIV21�f <br /> 2. CONTRACT PRICE ANC} PAYMENT Contractcr agrees to pay Supplier for the pzriormance af this contract the <br /> contract price set fQrth above, payabEe as follows. Bi!lings received by the th of the month w�i( be paid by the th of the <br /> follo�r�ing month 16 % retainage to be he{d. <br /> 3 TERMS AND CON�ITI�NS. Paragraph � thraugh 23, pri�ted an the reverse side hereof are a part af this agreement. <br /> As used herein the term "Suppfier" includes any subcontractor or supplier of labor, material, maferials or services, and the <br /> term "�,vork" inc{udes furnishing of labor, materials and service <br /> ACCEPTANCE <br /> Contractor� 5upo1� . i <br /> RO��A C NSTRUCTI N, l�tC UN ERS�F{RE SYST S, INC <br /> . I <br /> By: y. <br /> As fts Pre den <br /> Dat . ��_ ��_ aate: ��—i( �l Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.