My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14124
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2014 8:54:03 AM
Creation date
3/25/2014 8:54:02 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
13-14124
Building Department - Name
THERIEN,WILLIAM & PATRICIA
Address
37520 GILL AVE LOT 277
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEEP METAL ROOFING PRODUCT MATERIALS DRY <br /> Paint and finishes of METAL SYSTEMS, INC. panels and trim are designed <br /> to endure severe rain and wet weather conditions. CAUTION: Neither paint, <br /> galvanized, nor Galvalume finishes, are designed to be in continuous contact <br /> with water or condensation for long periods of time. <br /> Damage will result if uninstalled panels or trim are allowed to remain wet <br /> in storage. Be sure to store material that will not be installed immediately in a <br /> dry location. Wet material should be air-dried and re-stacked if installation <br /> immediate. <br /> NOTE: Plastic should not be used to cover metal panels. <br /> HOW TO FIGURE SCREWS: <br /> On lo�-gi�checi roofs, 6uty1 tape or caulk should be applied at the panel <br /> lap to keep water from overflowing the lap. <br /> For 2-foot spacing between rows of screws, multiply the tatallinear feet of <br /> metal tim�s �.7. <br /> Exampie; Ifyour orcle: is 1500 feet of 9-5 Rib roofing. <br /> 1500 x 2.7= 4050 screws would be applicable for fastening. <br /> Contact yout- Ivi-E'TAL S��'I'EMS, INC. representative far a free estimate. <br /> hrlPtal rac�f�g at�plicat�c�n can be aidea by pre-drilling panels, a��aw�ng scrPws <br /> to go quickly ar:d ac��:rately into the desired spacing. Pre-driiling wili work <br /> �ro�ided that �ila� holes are placed �.ecurately in the graper loc�tic�n� �n <br /> �ar�els. <br /> ��r}ir sp�cin� nust �e �nifurm and caref�ll�% :r�easured. <br /> �I�I� �I.��I'�'�' ��ND ��?�TE� <br /> rcr solid decking, at Ieast lr2-inch structural pIywood or OSE� (�/g" :€��- az� <br /> �iigh velocity wi�d zan� of 120 �n� above) supported on rafters at a v <br /> I??�.�irt���m p�7�" �n ��?2T��`. �?�?LI2S: ��; F,�� h�e�l ���f„� dr,an �i� e����'���� <br /> from the moist�u-e barrier �y �ninimu�n5 no�ir�aE i"x�" yeiic�w �;ir�e ��.tt,e�4 <br /> S�?EZ�`�t� �??':_ iI?axirr��?�r %.�" �P��t�rc nr �rr�n�riir�� tn uC�� '_�� �;�iC?�����C_???S ?�%��'? <br /> 4..a- _ <br /> i�i.����1:'t���?�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.