My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14124
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2014 8:54:03 AM
Creation date
3/25/2014 8:54:02 AM
Metadata
Fields
Template:
Building Department
Company Name
GRAND HORIZONS
Building Department - Doc Type
Permit
Permit #
13-14124
Building Department - Name
THERIEN,WILLIAM & PATRICIA
Address
37520 GILL AVE LOT 277
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pulin spacing can be up to 30 inches for 29-gauge (2 feet is most common ) <br /> and up to 4 1/2 feet for 26-gauge roofing. <br /> Screws should be placed on both sides of the ribs on the eave <br /> Screw Spacing (purlin) <br /> Liner feet of <br /> panels in your 12 inch 18 inch 24 inch 30 inch <br /> order <br /> 50 270 180 135 108 <br /> 100 540 360 270 216 <br /> 200 1,080 720 540 432 <br /> 300 1,620 1,080 810 648 <br /> 400 2,160 1,440 1,080 864 <br /> 500 2,700 1,800 1,350 1,080 <br /> 600 3,240 2,160 1,620 1,296 <br /> 700 3,780 2,520 1,890 1,512 <br /> 800 4,320 2,880 2,160 1,�2g <br /> 900 4,860 3,240 2,430 1,944 <br /> 1,000 5,400 3,600 2,700 2,160 <br /> 1,100 5,940 3,960 2,970 2,376 <br /> 1,200 6,480 4,320 3,240 2,592 <br /> Policies <br /> Indemnity: All prices and designs are subject to change without notice. <br /> Disclaimer: Despite the fact that we have made every attempt at accuracy in <br /> this manual, we are not responsible for typographic, printing, or technical <br /> errors. <br />
The URL can be used to link to this page
Your browser does not support the video tag.