Laserfiche WebLink
• �� Insp.No. Date: Sheet <br /> 3 05/16/13 2 of 4 <br /> Bracken W��er. Time Temp <br /> E N Ca I N E E R 1 N G SU�In 12:30 AM $Z�F <br /> ProjecUTask: <br /> 713-002 <br /> P�Se"t: Jeremy Hitt from Bracken Engineering and Vanselow Property <br /> Foreman Jessie Jacobs and CFI Crew <br /> UNDERPIN LIFT/STABILIZATION REPORT <br /> Lift and Pressure Amounts: <br /> Pier liit Amourit Pressure Pier Llft Amount Pressure Pier LiR Amount Pressure <br /> 1 1/16" 1000 <br /> 2 1/16" 1000 <br /> 3 1/16" 1000 <br /> 4 1/16" 1000 <br /> 5 1/1 G' 1000 <br /> 6 1/16" 1000 <br /> 7 1/16" 1000 <br /> 8 1/16" 1000 <br /> 9 1/16" 1000 <br /> 10 1/16" 1000 <br /> 11 1/15' 1000 <br /> 12 1l16" 1D00 <br /> Lift/Stabilization Squence: <br /> `All pins were pressurized at the same time and were stabilized at 1000 psi with a 1/16"stabilization lift <br /> . <br /> . <br /> e purpose is s ws was �s an ve a e con on a o serv an recor were in su n a <br /> compliance with the contract documents as well as acceptable industry standards.Portions of the information found within this <br /> report were obtained and provided by the contractor Therefore,Bracken Engineering,Inc.reserves the right to revise or update <br /> any of Uie observations,assessment andlor recommendations as conditwns change or additional information becomes available. <br /> Report uy: R�d by Attachmetrts: c�: <br /> JRH JCB Photo Proofsheets File-713-002 <br /> 2701 W Busch Blvd.,Suite 200,Tampa,F7orida 33618 T 800.971.7252 F SI3.243.9530 <br /> BRACKENENGINEERING.COM <br />