Laserfiche WebLink
� • �� Insp.No. Date: Sheet: <br /> 3 05/16/13 1 of 4 <br /> Bracken W��er Time Temp: <br /> ENGINEERING SUnn 12:30AM 82�F <br /> ProjecVfask <br /> 713-002 <br /> PresenY. Jeremy Hitt from Bracken Engineering and Vanselow Property <br /> Foreman Jessie Jacobs and CFI Crew <br /> UNDERPIN LIFT/STABILIZATION REPORT <br /> Pfe-Llft Ch@CkI1St: (place an X in box if completed) <br /> � Verified all data in monitoring file has been collected <br /> � Met with site Foreman <br /> � Verified all pins were installed <br /> � Verified all indicated pins have steel speader beams <br /> � Verifed direction of spreader beams for interior pins(if applicable) <br /> � Discussed and recorded lift/stabilization sequence of events with Foreman <br /> � Recorded as-buitt pin locations <br /> � Photographed distressed areas prior to lift <br /> � Recorded how lift is to be monitored from the exterior and interior <br /> � Photographed items above <br /> Pre-Lift Observations/Comments: <br /> * All underpins were installed and the site was prepped for the stabilization <br /> ` All steel spreader beams were installed <br /> ' The lift was monitored by optical transit on the exterior of the structure with a e strips positioned on the wall above each pin <br /> . <br /> . <br /> . <br /> . <br /> e purpose o is s e vis was o is an ve a e cons on a es o serv an recor were�n su n a <br /> compliance with the contrad documeMs as well as acceptable industry standards.Portions of the information found within this <br /> report were obtained and provided by the contractor Therefore,Braeken Engincering,Inc.reserves the right to revise or update <br /> any ot the observabons,assessment antl/or recommentlaLOns as cond�LOns change or adtlrtonal mformadon becomes available. <br /> Report by: Reviewed by Attachments: �: <br /> JRH JCB Photo Proofsheets File-713-002 <br /> 2701 W.Buach Blvd.Suite 200,Tampa,florida 33G18 T 800.9717252 F 913.243.9530 <br /> BRACKENENGtNEERING.COM <br />