My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14386/14387
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14386/14387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2014 10:55:48 AM
Creation date
4/23/2014 10:55:46 AM
Metadata
Fields
Template:
Building Department
Company Name
VILLAGE CHASE
Building Department - Doc Type
Permit
Permit #
13-14386/14387
Building Department - Name
VILLAGE CHASE OF ZH LTD
Address
39216 VILLAGE CHASE APTS 6035 & 6037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coastal Reconstruction Group <br /> � <br /> 55�0 Florida Mining Blvd. S. <br /> Suite 304 <br /> Jacksonville,FL 32257 <br /> O:904.880.1919 F: 888.880.1399 C:904.254.8053 <br /> benz@coastalreconstruction.com <br /> www.c oastalreconstructi on.com <br /> CRIB-07213-DEMO <br /> Unit 6037 <br /> Unit 6037 <br /> DESCRIPTION QNTY <br /> Note:When Demo is complete we are planning on removing all trusses(what is left of unit 6037 and over unit 6035).We are <br /> planning on installing a moisture barrier on the fire wall between unit 6033 and 6035 to stop unit 6033 from getting wet. <br /> NOTES: <br /> General <br /> DESCRIPTION QNTY <br /> 1. Complete Demo of units 6035 and 6037 down to studs where studs can be saved.This will include all 2.00 EA <br /> the contents in unit 6037 that are left by the tenant. <br /> Note:This includes demo and haul off of: <br /> 1.All interior finishings,drywall,flooring,cabinets,lights,trusses,roof sheathing and so on and any damaged exterior walls. <br /> 2.We are trying to save as much of the exterior walls as possible to not have to replace the brick.We will know better once the demo <br /> is complete. <br /> Once Demo is complete we will do one more site inspection to finalize scope of work. <br /> 2. Dumpster load-Approx.20 yards,4 tons of debris 6.00 EA <br /> 3. Commercial Supervision/Project Management-per hour 8.00 HR <br /> 4. Demo Permit 1.00 EA <br /> 5. Asbestos test fee-full service asbestos survey 1.00 EA <br /> 6. ArchitecturaUDrafting/Engineering(structural and mechanical) 1.00 EA <br /> Note: Completed stamped set of plans ready for permit. <br /> NOTES: <br /> CRIB-07213-DEMO 7/10/2013 Page:3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.